Barox RY-LGSP28-52 Series Operating Instructions Manual page 71

Table of Contents

Advertisement

For the activation of port 2 of the switch the port configuration is searched in the MIB directory.
When doing so attention must be paid for selecting the respective information block with write
function. The SET operation is opened by a click on "Go" and the OID entry is complemented
by ".2" (label of port 2). In addition to this the value "1" (for activation) is entered and confirmed
by "OK". A respective success message is generated upon a successful operation.
barox Kommunikation
71

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ry-lgsp28-10Ry-lgsp28-28Ry-lgsp28-52Ry-lgsp28-52/740Ry-lpite-442xgme

Table of Contents