Pre-Installation Checklist; Adjustable Downrod - Hunter DDI Installation Manual

Hide thumbs Also See for DDI:
Table of Contents

Advertisement

PRE-INSTALLATION CHECKLIST

!
BEFORE YOU BEGIN
A structural engineer has approved the mounting structure.
The location of the fan will allow for a minimum of two feet of blade clearance
from any obstruction and at least 10 feet of clearance above the floor.
The fan location will not be subjected to high winds.
If installing multiple fans, reference the fan placement chart on page 7 for
optimal spacing.
The control panel, motor and blade assemblies are all marked with the diameter.
Ensure the markings all match when assembling the fan.
The control panel voltage markings should match your buildings supply power.
The fan power should be installed within 3 ft of the top of the downrod.
Please refer to the chart on page 22 for the appropriate receptacle and breaker size.
Inspect product to ensure there are no visible damages or defects to fan(s)
components
(Refer to page 9 for fan components list)
Ensure fan components have not been disassembled or modified beyond the
scope which Hunter offers in their product line.
10
.

ADJUSTABLE DOWNROD

!
BEFORE YOU BEGIN
THERE ARE THREE DIFFERENT ADJUSTABLE DOWNROD LENGTH CONFIGURATIONS:
2.5 - 4 FT (0.77 - 1.22m) | 4.5 - 6 FT (1.38 - 1.83m) | 6.5 - 10 FT (1.99 - 3.05m)
DOWNROD WILL SHIP PRE-WIRED AND FULLY ASSEMBLED IN THE SHORTEST CONFIGURATION.
Downrod length adjustments may be made in increments of 6".
c). Industrial
adjustment bolt
(upper)
a). Upper mounting
d). Industrial
tube w. mounting
adjustment bolt
plate.
(lower)
b). Adjustable
downrod lower tube
TOOLS NEEDED
15mm socket
6mm hex key (Allen) wrench
11

Advertisement

Table of Contents
loading

Table of Contents