Pre-Installation Checklist - Hunter DDI Installation Manual

Hide thumbs Also See for DDI:
Table of Contents

Advertisement

PRE-INSTALLATION CHECKLIST

BEFORE YOU BEGIN
!
A structural engineer has approved the mounting structure.
The location of the fan will allow for a minimum of two feet of blade clearance
from any obstruction and at least 10 feet of clearance above the floor.
The fan location will not be subjected to high winds.
If installing multiple fans, reference the fan placement chart on page 6 for
optimal spacing.
The control panel, motor and blade assemblies are all marked with the diameter.
Ensure the markings all match when assembling the fan.
The control panel voltage markings should match your buildings supply power.
The fan power should be run to five feet outside the swept area of the fan. Please
refer to the chart on page 19 for the appropriate receptacle and breaker size.
10

Advertisement

Table of Contents
loading

Table of Contents