Step 6: Blades - Hunter DDI Installation Manual

Hide thumbs Also See for DDI:
Table of Contents

Advertisement

STEP 5: GUY WIRES
INSTALLATION
• Attach guy wire to building structure while maintaining a 45° angle between
• Do not wrap guy wires around the building structure. The guys wires could fray
F
G & H
Feed guy wires through disc to hold in place
Tighten bolts on
during turnbuckle installation. Pull excess
Gripples, and
cable until guy wire is taut. Place level against
then tighten the
the downrod and tighten the turnbuckles
set screws on
by hand in a crisscross pattern, periodically
the turnbuckles.
checking to ensure the downrod is plumb and
the fan is level.
F
H
20
the ceiling and the guy wire.
if in contact with the building structure.
TURNBUCKLE
SET SCREW
G
2.5mm
Allen

STEP 6: BLADES

INSTALLATION
A
B
To install blade, insert the
Start the nylon lock nuts onto
press studs through the
the press studs to hold in
holes in the blade holder.
place.
Remember to install with the
numbers facing up.
A
C
C
D
Tighten the nylon locknuts
Repeat steps A-C for each of
on the press studs using the
the two remaining blades.
19mm wrench or socket.
B
19mm
Deep socket
or wrench
21

Advertisement

Table of Contents
loading

Table of Contents