Set Up And Preparation For Operation - Hyundai LS5T-52 Owner's Manual

5 ton log splitter
Table of Contents

Advertisement

SET UP AND PREPARATION FOR OPERATION

1.Bolt the Support Leg to the Log Splitter, lift the log splitter by the handles at both ends and
place it on a 60-75cm high, stable, flat and level work surface.
2.Familiarize yourself with the controls and features of this log splitter in the illustrations.
1. Oil Tank
2. Log Pusher
3. Work Table
4. Wedge
5. Lift Handle
6. Support Leg
7. Work Table Extension w/log
Retaining Plates
8. Switch
9. Motor
10.Pushbutton Box
11.Wheels for Minor Moving ONLY.
12.Lift Handle
13.Hydraulic Control Lever
14.Control Lever Guard
15.Bleed Screw
16.Oil Drain Bolt w/ Dipstick
Before operating the log splitter, the Bleed Screw should be loosened by some rotations
until air can go in and out of the oil tank smoothly.
Air flow thru the Bleed Screw hole should be detectable during the log splitter is under
operations.
Before moving the log splitter, make sure the Bleed Screw is tightened to avoid oil leaking
from this point.
65563UK00M100.indd 8
FAILED TO LOOSEN THE BLEED SCREW WILL KEEP THE
SEALED AIR IN HYDRAULIC SYSTEM BEING COMPRESSED
AFTER BEING DECOMPRESSED. SUCH CONTINUOUS AIR
COMPRESSION AND DECOMPRESSION WILL BLOW OUT THE
SEALS OF THE HYDRAULIC SYSTEM AND CAUSE PERMANT
DAMAGE TO THE LOG SPLITTER.
8
2019/8/30 11:38:43

Advertisement

Table of Contents
loading

Table of Contents