Installation, operation and maintenance instructions
High voltage flameproof motors for explosive atmosphere
Control list 1 – General
Customer
Machine type
Machine serial n°
Arrival date of the machine
Transport damage to motor and/or accessories
(In case of damage use control list 2)
Missing parts at delivery
(In case of missing parts use control list 3)
Motor storage period longer than 6 months
(In case of long storage use control list 4)
Mechanical installation: control list 5
Electrical installation: control list 6
Test run 1: control list 7
Test run 2: control list 8
Operational inspection: control list 9
Periodic maintenance: control list 10
Inside inspection: control list 11
Comments:
For record files
To
Issued by
Signature of
the consignee
Yes No
Yes No
Yes No
From
Sheet No.
3AAM101028 E
Rev. B
01.2023
Page 1 di 13
DATE
SIGNATURE
Date
Page
Reg. n°
Continues on page
Issued by: MOLM