Bosch Worcester Greenstar CDi Compact ErP Series Installation, Commissioning And Servicing Instruction page 70

Wall hung rsf gas fired condensing combination boiler
Table of Contents

Advertisement

FAULT FINDING AND DIAGNOSIS
eco
°C
reset
ok
°F
Menu 1
e
max
Test 1
eco
°C
reset
ok
°F
Test 1
e
max
t01
Fig. 130 Selecting test menu
Selecting a test component
Refer to table 32 and use the
through the various test options.
eco
°C
reset
ok
°F
Test 1
e
max
t01
Fig. 131 Scroll through test options
70
2
1
1
3
0
bar
4
1.
min
max
°C
°F
2
1
1
3
0
bar
4
2.
min
max
°C
°F
6720646608-79.1Wo
and
arrow buttons to scroll
2
1
1
3
0
bar
4
1.
min
max
°C
°F
6720646608-82.1Wo
Testing the component
▶ Select a component to test.
▶ Press the
button, the value 0 will flash.
ok
▶ Use the
arrow button to change the value to a flashing 1.
▶ Press
to confirm the change, the value 1 will stop flashing and a
ok
will displayed for 3 seconds.
The test will run for 30 to 60 seconds unless the value is changed back
to 0 before that time, the test may take 10 seconds to start.
eco
°C
reset
ok
°F
t01
e
1.
max
t01
eco
°C
reset
ok
°F
Test 1
1.
e
max
t01
eco
°C
reset
ok
°F
t01
e
1.
max
t01
Fig. 132 Testing component
Resetting the test component
After completing the test:
▶ Press the
button, the value 1 will flash.
ok
▶ Press the
arrow button, the value will change to a flashing 0.
▶ Press
to confirm the change, a
ok
CDi Compact
2
1
1
3
0
4
bar
min
max
°C
°F
2
1
1
3
0
bar
4
min
max
°C
°F
2
1
1
3
0
bar
4
min
max
°C
°F
will display for 3 seconds.
ErP
- 6 720 813 276 (2015/07)

Advertisement

Table of Contents
loading

Table of Contents