PRE-INSTALLATION
High level horizontal flue
High level horizontal flue
Table 16
High level horizontal flue with additional elbows
High level horizontal flue with 2 x 90° bends
Table 17
High level horizontal flue with additional elbows
High level horizontal flue with 3 x 90° bends
Table 18
20
Vertical balanced flue assembly
Maximum flue length
(mm)
60/100
80/125
Vertical balanced flue assembly
6,000
15,000
Table 19
Vertical balanced flue with elbow offset (2 x 90 ° bends)
Maximum flue length
(mm)
60/100
80/125
4,000
13,000
Vertical balanced flue with 2 x 90° bends
Table 20
Vertical balanced flue with elbow offset (2 x 45 ° bends)
Maximum flue length
(mm)
60/100
80/125
2,000
11,000
Vertical balanced flue with 2 x 45° bends
Table 21
A = 300 mm
B = 500 mm
Maximum flue length
60/100
6,000
Maximum flue length
60/100
2,000
Maximum flue length
60/100
4,000
CDi Compact
ErP
- 6 720 813 276 (2015/07)
(mm)
80/125
15,000
(mm)
80/125
11,000
(mm)
80/125
13,000