Installation

This chapter describes the procedure to mount and install your SS2100 analyzer. Refer to the
Parameters →
for system programming and operation information.
Installing the analyzer requires steps that when carefully followed ensure proper mounting and connection. The
steps are outlined in the following sections:
• Mounting the analyzer
• Connecting electrical power
• Connecting signals and alarms
• Connecting the gas lines
The safety of the analyzer is the responsibility of the installer and the organization they represent.
Incorrect transportation can cause injury and damage the device.
 Always use a lifting truck or a fork-lift to transport the analyzer. Two people are needed for the installation.
 Ensure all equipment used for lifting/moving the analyzer is rated for the weight load.
 Lift the device by the recessed grips.
5.1

Site requirements and installation conditions

The SS2100 analyzer can be installed on a wall. Consider the following when choosing an appropriate location for
the analyzer:
• Choose a shaded area or use an optional analyzer hood (or equivalent) to minimize sun exposure to the fully
mounted analyzer.
• Position the instrument so it is not difficult to operate adjacent devices. Allow 1 m (3 feet) of space in front
of the analyzer.
• Ensure that supply and return lines reach the supply and return connections on the sample system enclosure.
Maintain flexibility in the sample and return lines so that the lines are not under excessive stress.
• The breaker in the power distribution panel or switch will be the primary means of disconnecting the power
from the analyzer. Therefore, the power distribution panel or switch should be located in close proximity to
the equipment and within easy reach of the operator. A switch or circuit breaker shall not interrupt a
protective earth ground.
• Before removing the analyzer from the crate, move the analyzer as close as possible to the final installation
location.
Intense sun exposure in some areas may cause the analyzer temperature to exceed the maximum.
 Endress+Hauser analyzers are designed for operation within the specified ambient temperature range.