Side-By-Side 19" Rack Mounting; Overview; Mounting Procedure For Side-By-Side Rack Mounting - ABB Relion SAM600 Installation Manual

Switchgear control unit
Hide thumbs Also See for Relion SAM600:
Table of Contents

Advertisement

1MRK 514 030-UEN B
PosNo
1
2
3
4
5
6
5.3.3

Side-by-side 19" rack mounting

5.3.3.1

Overview

IED case size 1/2 x 19" and RHGS cases can be mounted side-by-side up to a maximum size of
19". For side-by-side rack mounting, the side-by-side mounting kit together with the 19" rack
panel mounting kit must be used. The mounting kit has to be ordered separately.
5.3.3.2

Mounting procedure for side-by-side rack mounting

3
4
IEC17000121 V1 EN-US
Figure 5:
Switchgear control unit SAM600-IO
Installation manual
Description
Washer
Screw
Mounting profiles
Nut
Spacer
Mounting angles
Use only the screws included in the mounting kit when mounting the plates and
the angles on the IED. Screws with wrong dimension may damage the PCBs
inside the IED.
1
2
IEC17000121-1-en.vsdx
Side-by-side rack mounting details.
The required torque for the screws is 3.5 Nm.
© Copyright 2017 ABB. All rights reserved
Quantity
8
8
2
6
4
2
3
Section 5
Mounting
Type
M4
M4x6
-
M6
-
-
IP10323-1 v1
M11974-3 v3
M11955-2 v4
19

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion sam600-io

Table of Contents