Download Print this page

York 026-36345-002 Installation Instructions Manual page 4

Packaged rooftop units

Advertisement

Condenser pans must slope downward
toward End Panel (H). Refer to Figure 6.
C
FIGURE 6 -
13. Apply 3/4 x 1/8" Tacky Tape in locations shown
in Figures 7 and 10.
1
12
8
FIGURE 7 -
14. Install the Condenser Panels (L) in the order as
shown in Figures 7 and 8. As each panel is in-
stalled in place, attach the lower edge of the Con-
denser Panels (L) with .25-14 x 1" screws.
4
7
32
8
D
K
1
12
8
11
K
K
K
A
TACKY
TAPE
L(5)
L(4)
K
K
5
11
8
Make sure Support Rails (K) are located
properly so condensation can run off con-
denser panels. Refer to Figure 6.
3
31
8
3
31
8
3
31
8
5
8
11
1
10
2
H
TACKY
TACKY
TAPE
TAPE
L(3)
K
1
11
10
2
TACKY
TAPE
FORM YRK2-N1
ISSUE DATE: 03/18/2019
B
10
TACKY
TAPE
L(2)
L(1)
K
10
H
LD08554
LD08555
YORK

Advertisement

loading

This manual is also suitable for:

026-36345-102