To Connect A Smart Grid - Daikin ETSXB16E7 Installation Manual

Hide thumbs Also See for ETSXB16E7:
Table of Contents

Advertisement

[9.8.1]=3 (Benefit kWh power supply = Safety
thermostat)
1 Open the following (see
"4.2.1 To open the indoor
1 User interface panel
2 Switch box
3 Switch box cover
4 Top cover
2 Connect the safety thermostat (normally closed) cable to the
appropriate terminals as shown in the illustration below.
Note: The jumper wire (factory-mounted) must be removed from the
respective terminals.
A
B
7 8
X 5M
1
3 Fix the cable with cable ties to the cable tie mountings. General
information, see
"6.3.1  To connect the electrical wiring to the
unit" [ 4  17].
indoor
NOTICE
Make sure to select and install the safety thermostat
according to the applicable legislation.
In any case, to prevent unnecessary tripping of the safety
thermostat, we recommend the following:
▪ The safety thermostat is automatically resettable.
▪ The safety thermostat has a maximum temperature
variation rate of 2°C/min.
▪ There is a minimum distance of 2 m between the safety
thermostat and the 3‑way valve.
NOTICE
Error. If you remove the jumper (open circuit) but do NOT
connect the safety thermostat, stop error 8H-03 will occur.
ETSH/X(B)16P30+50E
Daikin Altherma 3 H HT ECH₂O
4P679468-1B – 2022.09
unit" [ 4  8]):
4
3
6.3.13
2
1
This topic describes 2 possible ways to connect the indoor unit to a
Smart Grid:
▪ In case of low voltage Smart Grid contacts
▪ In case of high voltage Smart Grid contacts. This requires the
installation of the Smart Grid relay kit (EKRELSG).
The 2 incoming Smart Grid contacts can activate the following Smart
Grid modes:
The use of a Smart Grid pulse meter is not mandatory:
If Smart Grid pulse meter is... Then [9.8.8] Limit setting kW
Used
([9.A.2] Electricity meter 2 ≠
None)
Not used
7
8
([9.A.2] Electricity meter 2 =
Q4L
None)
In case of low voltage Smart Grid contacts
Wires (Smart Grid pulse meter): 0.5 mm²
A
Wires (low voltage Smart Grid contacts): 0.5 mm²
[9.8.4]=3 (Benefit kWh power supply = Smart grid)
[9.8.5] Smart grid operation mode
B
[9.8.6] Allow electrical heaters
[9.8.7] Enable room buffering
[9.8.8] Limit setting kW
The wiring of the Smart Grid in case of low voltage contacts is as
follows:
3
4
1
S
10
S
1 Connect the wiring as follows:
6 Electrical installation
INFORMATION
ALWAYS configure the safety thermostat after it is
installed. Without configuration, the unit will ignore the
safety thermostat contact.

To connect a Smart Grid

Smart Grid contact
Smart Grid operation mode
1
2
0
0
Free running
0
1
Forced off
1
0
Recommended on
1
1
Forced on
Not applicable
Applicable
X 5M
1
5
6
7
8
9
10
a
2
S11S
S S
4
a
Jumper (factory-mounted). If you also connect a safety
thermostat (Q4L), replace the jumper with the safety
thermostat wires.
S4S
Smart Grid pulse meter
1
Low voltage Smart Grid contact 1
/S10S
2
Low voltage Smart Grid contact 2
/S11S
is...
Installation manual
25

Advertisement

Table of Contents
loading

This manual is also suitable for:

Altherma 3 h ht ech2oEtsh16e7

Table of Contents