Table of Contents

Advertisement

Quick Links

Installation manual
Daikin Altherma 3 H HT ECH₂O
https://daikintechnicaldatahub.eu
ETSH16P30E▲▼
ETSH16P50E▲▼
ETSHB16P30E▲▼
ETSHB16P50E▲▼
ETSX16P30E▲▼
ETSX16P50E▲▼
ETSXB16P30E▲▼
ETSXB16P50E▲▼
Installation manual
English
▲= A, B, C, ..., Z
Daikin Altherma 3 H HT ECH₂O
▼= , , 1, 2, 3, ..., 9

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ETSXB16E7 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Daikin ETSXB16E7

  • Page 1 Installation manual Daikin Altherma 3 H HT ECH₂O https://daikintechnicaldatahub.eu ETSH16P30E▲▼ ETSH16P50E▲▼ ETSHB16P30E▲▼ ETSHB16P50E▲▼ ETSX16P30E▲▼ ETSX16P50E▲▼ ETSXB16P30E▲▼ ETSXB16P50E▲▼ Installation manual English ▲= A, B, C, …, Z Daikin Altherma 3 H HT ECH₂O ▼= , , 1, 2, 3, …, 9...
  • Page 2 3P664373-4C...
  • Page 3 3P664373-5D...
  • Page 4: Table Of Contents

    6.3.10 To connect the changeover to external heat source... 23 6.3.11 To connect the power consumption digital inputs ..24 ▪ Format: Digital files on https://www.daikin.eu. Use the search 6.3.12 To connect the safety thermostat (normally closed function to find your model.
  • Page 5: Specific Installer Safety Instructions

    ▪ A subset of the latest technical data is available on the regional Daikin website (publicly accessible). WARNING ▪ The full set of latest technical data is available on the Daikin Fixing method of the indoor unit MUST be in accordance Business Portal (authentication required).
  • Page 6: About The Box

    WARNING The backup heater MUST have a dedicated power supply and MUST be protected by the safety devices required by the applicable legislation. Installation manual ETSH/X(B)16P30+50E Daikin Altherma 3 H HT ECH₂O 4P679468-1B – 2022.09...
  • Page 7: Indoor Unit

    Piping Calculation tool. The Hydronic Piping Calculation tool is part of the Heating Solutions Navigator which can be reached via https://professional.standbyme.daikin.eu. Please contact your dealer if you have no access to Heating Solutions Navigator. ETSH/X(B)16P30+50E Installation manual Daikin Altherma 3 H HT ECH₂O 4P679468-1B – 2022.09...
  • Page 8: Opening And Closing The Unit

    Do NOT damage or remove the foam sealing of the switch 3 Lower the switch box. box. 3 Disconnect the ground connection from the top cover of the switch box. Installation manual ETSH/X(B)16P30+50E Daikin Altherma 3 H HT ECH₂O 4P679468-1B – 2022.09...
  • Page 9: To Close The Indoor Unit

    Ensure that the water level cannot mount above the overspill. 6 Connect the drain pan hose to the drain pan connection and connect to an appropriate drain. ETSH/X(B)16P30+50E Installation manual Daikin Altherma 3 H HT ECH₂O 4P679468-1B – 2022.09...
  • Page 10: Piping Installation

    Check that the minimum flow rate in the installation is guaranteed in circuit to ensure that the maximum pressure is NOT exceeded. all conditions. The minimum water pressure to operate is 1 bar. Minimum required flow rate 12 l/min Installation manual ETSH/X(B)16P30+50E Daikin Altherma 3 H HT ECH₂O 4P679468-1B – 2022.09...
  • Page 11: Connecting Water Piping

    2 Remove the thermal insulation of the hydraulic block. Open the vent valve on the pump by one turn. Afterwards put the thermal insulation back on the hydraulic block. ETSH/X(B)16P30+50E Installation manual Daikin Altherma 3 H HT ECH₂O 4P679468-1B – 2022.09...
  • Page 12 A pressure relief valve (field supply) with an opening pressure of maximum 10  bar (=1  MPa) must be installed on the domestic cold water inlet connection in accordance with the applicable legislation. Installation manual ETSH/X(B)16P30+50E Daikin Altherma 3 H HT ECH₂O 4P679468-1B – 2022.09...
  • Page 13: To Connect A Pressure Vessel

    ▪ After the first filling and before switching on the unit with the mains switch, check whether all electric parts and connection points are dry. ETSH/X(B)16P30+50E Installation manual Daikin Altherma 3 H HT ECH₂O 4P679468-1B – 2022.09...
  • Page 14: To Protect The Water Circuit Against Freezing

    ▪ The domestic hot water heat exchanger the system from bursting or from freezing. To prevent the system from freezing, more glycol is required. Installation manual ETSH/X(B)16P30+50E Daikin Altherma 3 H HT ECH₂O 4P679468-1B – 2022.09...
  • Page 15: To Fill The Storage Tank

    Outdoor water piping insulation See the installation manual of the outdoor unit, or the installer reference guide. ETSH/X(B)16P30+50E Installation manual Daikin Altherma 3 H HT ECH₂O 4P679468-1B – 2022.09...
  • Page 16: Electrical Installation

    "6.3.12 To connect the safety Wires: 2×0.75 mm² thermostat (normally closed contact)" [ 4  24]. [9.B.1]=2 (External sensor = Room) Smart Grid "6.3.13 To connect a Smart [1.7] Room sensor offset Grid" [ 4  25]. Installation manual ETSH/X(B)16P30+50E Daikin Altherma 3 H HT ECH₂O 4P679468-1B – 2022.09...
  • Page 17: To Connect The Electrical Wiring To The Indoor Unit

    If the switch box is lowered in service position while the electrical installation is done, additional cable length has to be taken into account adequately. The cable routing in normal position is longer than in service position. ETSH/X(B)16P30+50E Installation manual Daikin Altherma 3 H HT ECH₂O 4P679468-1B – 2022.09...
  • Page 18: To Connect The Main Power Supply

    2 Connect the main power supply. In case of normal kWh rate power supply Interconnection Wires: (3+GND)×1.5 mm² cable Power supply Wires: 1N+GND indoor unit Maximum running current: 6.3 A — Installation manual ETSH/X(B)16P30+50E Daikin Altherma 3 H HT ECH₂O 4P679468-1B – 2022.09...
  • Page 19: To Connect The Backup Heater Power Supply

    MUST be protected by the safety devices required by the applicable legislation. CAUTION To guarantee the unit is completely earthed, ALWAYS connect the backup heater power supply and the earth cable. ETSH/X(B)16P30+50E Installation manual Daikin Altherma 3 H HT ECH₂O 4P679468-1B – 2022.09...
  • Page 20: To Connect The Backup Heater To The Main Unit

    1N~, 50 Hz 230 V AC 4 Top cover 2 Connect both connection cables from the backup heater EKECBU* to the appropriate connectors as shown in the illustration below. Installation manual ETSH/X(B)16P30+50E Daikin Altherma 3 H HT ECH₂O 4P679468-1B – 2022.09...
  • Page 21: To Connect The Shut-Off Valve

    Wiring is different for a NC (normally closed) valve and a NO (normally open) valve. 3 Switch box cover 4 Top cover 2 Connect the electricity meters cable to the appropriate terminals as shown in the illustration below. ETSH/X(B)16P30+50E Installation manual Daikin Altherma 3 H HT ECH₂O 4P679468-1B – 2022.09...
  • Page 22: To Connect The Domestic Hot Water Pump

    2 Connect the alarm output cable to the appropriate terminals as 2 Connect the domestic hot water pump cable to the appropriate shown in the illustration below. terminals as shown in the illustration below. Installation manual ETSH/X(B)16P30+50E Daikin Altherma 3 H HT ECH₂O 4P679468-1B – 2022.09...
  • Page 23: To Connect The Space Cooling/Heating On/Off Output

    4 Top cover 2 Connect the changeover to external heat source cable to the appropriate terminals as shown in the illustration below. ETSH/X(B)16P30+50E Installation manual Daikin Altherma 3 H HT ECH₂O 4P679468-1B – 2022.09...
  • Page 24: To Connect The Power Consumption Digital Inputs

    (normally closed contact) Wires: 2×0.75 mm² Maximum length: 50 m Safety thermostat contact: 16 V DC detection (voltage supplied by PCB). The voltage-free contact shall ensure the minimum applicable load of 15 V DC, 10 mA. Installation manual ETSH/X(B)16P30+50E Daikin Altherma 3 H HT ECH₂O 4P679468-1B – 2022.09...
  • Page 25: To Connect A Smart Grid

    ▪ There is a minimum distance of 2 m between the safety thermostat and the 3‑way valve. NOTICE Error. If you remove the jumper (open circuit) but do NOT connect the safety thermostat, stop error 8H-03 will occur. ETSH/X(B)16P30+50E Installation manual Daikin Altherma 3 H HT ECH₂O 4P679468-1B – 2022.09...
  • Page 26 Jumper (factory-mounted). If you also connect a safety thermostat (Q4L), replace the jumper with the safety thermostat wires. Smart Grid pulse meter 1 Install the switch box metal insert. Installation manual ETSH/X(B)16P30+50E Daikin Altherma 3 H HT ECH₂O 4P679468-1B – 2022.09...
  • Page 27: To Connect The Wlan Cartridge (Delivered As Accessory)

    X 5M X 5M.9 5 Connect the high voltage wiring as follows: 6.3.15 To connect the solar input Wires: 0.5 mm² Solar input contact: 5 V DC (voltage supplied by PCB) ETSH/X(B)16P30+50E Installation manual Daikin Altherma 3 H HT ECH₂O 4P679468-1B – 2022.09...
  • Page 28: To Connect The Dhw Output

    ▪ First time – Configuration wizard. When you turn ON the user interface for the first time (via the unit), the configuration wizard starts to help you configure the system. Installation manual ETSH/X(B)16P30+50E Daikin Altherma 3 H HT ECH₂O 4P679468-1B – 2022.09...
  • Page 29: To Access The Most Used Commands

    The Advanced user pin code is 1234. Additional menu items for the screen and request to restart the system. user are now visible. When confirmed, the system will restart and recent changes will be applied. ETSH/X(B)16P30+50E Installation manual Daikin Altherma 3 H HT ECH₂O 4P679468-1B – 2022.09...
  • Page 30: Configuration Wizard

    To manually recover it via the user interface, go to the zone: Malfunctioning main menu screen and confirm whether the backup heater can take over the heat load or not. a Main LWT zone Installation manual ETSH/X(B)16P30+50E Daikin Altherma 3 H HT ECH₂O 4P679468-1B – 2022.09...
  • Page 31: Configuration Wizard: Backup Heater

    If the storage temperature setpoint is higher than 50°C and [E-0D] Glycol Filled system: Is the system no auxiliary boiler is installed, Daikin recommends NOT to filled with glycol? disable the backup heater second step because it will have ▪ 0: No a big impact on the required time for the unit to heat up the storage tank.
  • Page 32: Configuration Wizard: Main Zone

    Influence of the LWT setpoint mode [2.4] is as follows: ▪ In Fixed LWT setpoint mode, the scheduled actions consist of desired leaving water temperatures, either preset or custom. Installation manual ETSH/X(B)16P30+50E Daikin Altherma 3 H HT ECH₂O 4P679468-1B – 2022.09...
  • Page 33: Configuration Wizard: Additional Zone

    ▪ 2-points curve ▪ Slope-offset curve Which type of curve you use to make adjustments, depends on your personal preference. "7.3.4  Using weather-dependent curves" [ 4  35]. ETSH/X(B)16P30+50E Installation manual Daikin Altherma 3 H HT ECH₂O 4P679468-1B – 2022.09...
  • Page 34: 2-Points Curve

    ▪ Change the slope to differently increase or decrease the temperature leaving water different ambient ▪ : Storage tank temperatures. For example, if leaving water temperature is in Installation manual ETSH/X(B)16P30+50E Daikin Altherma 3 H HT ECH₂O 4P679468-1B – 2022.09...
  • Page 35: Using Weather-Dependent Curves

    ON/OFF setpoints for that zone or for the tank. When the maximum condition. or minimum setpoint is reached, the curve flattens out. ETSH/X(B)16P30+50E Installation manual Daikin Altherma 3 H HT ECH₂O 4P679468-1B – 2022.09...
  • Page 36: Additional Zone

    ▪ 2: 2 contacts 7.4.3 Information Dealer information The installer can fill in his contact number here. Code Description [8.3] Number that users can call in case of problems. Installation manual ETSH/X(B)16P30+50E Daikin Altherma 3 H HT ECH₂O 4P679468-1B – 2022.09...
  • Page 37: Menu Structure: Overview Installer Settings

    Main zone pump fixed PWM Mixing valve turning time Only applicable in Swedish language. INFORMATION Depending on the selected installer settings and unit type, settings will be visible/invisible. ETSH/X(B)16P30+50E Installation manual Daikin Altherma 3 H HT ECH₂O 4P679468-1B – 2022.09...
  • Page 38: Commissioning

    Next commissioning instructions in this chapter, a general ▪ Between the local supply panel and the indoor unit commissioning checklist is also available on the Daikin ▪ Between the indoor unit and the valves (if applicable) Business Portal (authentication required).
  • Page 39: To Perform An Air Purge

    Purpose Perform an actuator test run to confirm the operation of the different actuators. For example, when you select Pump, a test run of the pump will start. ETSH/X(B)16P30+50E Installation manual Daikin Altherma 3 H HT ECH₂O 4P679468-1B – 2022.09...
  • Page 40: To Set Up Bivalent Heat Sources

    ▪ Explain the user how to properly operate the system and what to do in case of problems. ▪ Show the user what to do for the maintenance of the unit. Installation manual ETSH/X(B)16P30+50E Daikin Altherma 3 H HT ECH₂O 4P679468-1B – 2022.09...
  • Page 41: 10 Technical Data

    10 Technical data Technical data A subset of the latest technical data is available on the regional Daikin website (publicly accessible). The full set of latest technical data is available on the Daikin Business Portal (authentication required). 10.1 Piping diagram: Indoor unit...
  • Page 42: Wiring Diagram: Indoor Unit

    (1) Main power connection (1) Main power connection SWB1 Main switch box Outdoor unit Outdoor unit SWB2 Backup heater switch box SWB1 Switch box (2) User interface (2) User interface Installation manual ETSH/X(B)16P30+50E Daikin Altherma 3 H HT ECH₂O 4P679468-1B – 2022.09...
  • Page 43 Smart Grid contacts Smartgrid feed-in Smart Grid feed-in Solar input Solar input Space C/H On/OFF output Space cooling/heating On/OFF output SWB1 Switch box (4) Option PCBs (4) Option PCBs ETSH/X(B)16P30+50E Installation manual Daikin Altherma 3 H HT ECH₂O 4P679468-1B – 2022.09...
  • Page 44 A14P: P1-P2 user interface Power limitation A8P: X801M: 4-5 user interface communication demand input 4 signal 2 core 2x0.75 Only for LAN adapter A13P: P1-P2 user interface communication 4D132247 B Installation manual ETSH/X(B)16P30+50E Daikin Altherma 3 H HT ECH₂O 4P679468-1B – 2022.09...
  • Page 48 4P679468-1 B 0000000B 4P679468-1B 2022.09 Verantwortung für Energie und Umwelt...

This manual is also suitable for:

Altherma 3 h ht ech2oEtsh16e7

Table of Contents