Summary of Contents for Deye SUN-5K-SG01LP1-US

  • Page 1 Hybrid Inverter User Manual...
  • Page 2: Table Of Contents

    Contents 1. Safety Introductions ………………………………………………… 01 2. Product instructions 01-04 ………………………………………………… 2.1 Product Overview 2.2 Product Size 2.3 Product Features 2.4 Basic System Architecture 3. Installation 05-29 …………………………………………………………… 3.1 Parts list 3.2 Mounting instructions 3.3 Battery connection 3.4 Grid connection and backup load connection 3.5 PV Connection 3.6 CT Connection 3.6.1 Meter Connection...
  • Page 3: Safety Introductions

    Contents may be periodically updated or revised due to product development. The informa�on in this manual is subject to change without no�ce. The latest manual can be acquired via service@deye.com.cn 1. Safety Introduc�ons · This chapter contains important safety and opera�ng instruc�ons. Read and keep this manual for future reference.
  • Page 4: Product Overview

    2.1 Product Overview 1: Inverter Indicators 7: CAN Port 13: Grid 2: LCD display 8: Ba�ery input connectors 14: Generator input 3: Func�on Bu�ons 9: Func�on Port 15: Load 4: DC Switch 10: Meter_CON port 16: WiFi Interface 5: Power on/off bu�on 11: Parallel port 6: RS 485 port 12: PV input with two MPPT...
  • Page 5: Product Size

    2.2 Product Size Inverter Size - 03 -...
  • Page 6: Product Features

    2.3 Product Features - Supports Split phase 120/240Vac, Three-phase 120/208Vac system. - Self-consump�on and feed-in to the grid. - Auto restart while AC is recovering. - Programmable supply priority for ba�ery or grid. - Programmable mul�ple opera�on modes: On grid, off grid and UPS. - Configurable ba�ery charging current/voltage based on applica�ons by LCD se�ng.
  • Page 7: Parts List

    3. Installa�on 3.1 Parts List Check the equipment before installa�on. Please make sure nothing is damaged in the package. You should have received the items in the following package: Stainless steel an�-collision Parallel communica�on Hybrid inverter bolt M8×80 cable x1 User manual L-type Hexagon wrench...
  • Page 8 3.2 Moun�ng instruc�ons Installa�on Precau�on This Hybrid inverter is designed for outdoor use(IP65), Please make sure the installa�on site meets below condi�ons: · Not in direct sunlight · Not in areas where highly flammable materials are stored. · Not in poten�al explosive areas. ·...
  • Page 9 ≥500mm ≥500mm For proper air circula�on to dissipate heat, allow a clearance of approx. 50cm to the side and approx. 50cm above and below the unit. And 100cm to the front. Moun�ng the inverter Remember that this inverter is heavy! Please be careful when li�ing out from the package. Choose the recommend drill head(as shown in below pic) to drill 4 holes on the wall, 82-90mm deep.
  • Page 10 12 mm ( 0.47 in.) 82~90mm [(3.23 in.)to(3.54 in.)] 3.3 Ba�ery connec�on For safe opera�on and compliance, a separate DC over-current protector or disconnect device is required between the ba�ery and the inverter. In some applica�ons, switching devices may not be required but over-current protectors are s�ll required.
  • Page 11 All wiring must be performed by a professional person. Connec�ng the ba�ery with a suitable cable is important for safe and efficient opera�on of the system. To reduce the risk of injury, refer to Chart 3-2 for recommended cables. Please follow below steps to implement ba�ery connec�on: 1.
  • Page 12 3.3.2 Func�on port defini�on Inverter RS 485 1 2 3 4 5 6 7 8 9 10 Meter_CON Parallel_A Parallel_B RS 485: RS 485 port for ba�ery communica�on. 240V Coil CAN: CAN port for ba�ery Neutral communica�on. Earth Batt Temp Bond Sensor Parallel A: Parallel communica�on port 1...
  • Page 13 3.3.3 Temperature sensor connec�on for lead-acid ba�ery Temp. sensor - 11 -...
  • Page 14 3.4 Grid connec�on and backup load connec�on · Before connec�ng to grid, please install a separate AC breaker between inverter and grid. Also, it is recommended that installs an AC breaker between backup load and inverter.This will ensure the inverter can be securely disconnected during maintenance and fully protected from over current.
  • Page 15 GRID LOAD GEN PORT (Region:EU) GRID GEN PORT LOAD (Region:US) GRID GEN PORT LOAD - 13 -...
  • Page 16: Pv Connection

    Be sure that AC power source is disconnected before a�emp�ng to wire it to the unit. 3. Then, insert AC output wires according to polari�es indicated on the terminal block and �ghten terminal. Be sure to connect corresponding N wires and PE wires to related terminals as well. 4.
  • Page 17 3.5.1 PV Module Selec�on: When selec�ng proper PV modules, please be sure to consider below parameters: 1) Open circuit Voltage (Voc) of PV modules not exceeds max. PV array open circuit voltage of inverter. 2) Open circuit Voltage (Voc) of PV modules should be higher than min. start voltage. 3) The PV modules used to connected to this inverter shall be Class A ra�ng cer�fied according to lEC 61730.
  • Page 18: Ct Connection

    3.6 CT Connec�on (Region:EU) Grid Load Inverter White wire Black wire Arrow pointing inverter Grid The primary side of the CT needs to be clamped on the If the data read by the CT is wrong, you can try to point Grid live line.
  • Page 19: Meter Connection

    3.6.1 Meter Connec�on (Region:EU ) Grid Load Inverter Breaker Meter_CON Parallel_A Parallel_B System connec�on diagram for the CHNT meter Grid Grid input Output RS 485 DDSU666 DIN-RAIL METER RS485A 230V 5(60) A 800imp/kWh RS485B CHNT DDSU666 CHINT meter Grid Load RS485 Inverter Breaker...
  • Page 20 (Region:US) Grid Load N L2 L1 N L2 L1 N L2 L1 N L2 L1 Inverter Breaker Meter_CON Parallel_A Parallel_B RS485A RS485B Three-Phase Smart Meter (1,4,7,10) (3,6,9,10) RS 485 CHINT meter CHNT DTSU666 Three-Phase Smart Meter Grid Grid Load N L2 L1 N L2 L1 N L2 L1 N L2 L1...
  • Page 21: Earth Connection(Mandatory)

    Note: When the inverter is in the off-grid state, the N line needs to be connected to the earth. Note: In final installa�on,breaker cer�fied according to IEC 60947-1 and IEC 60947-2 shall be installed with the equipment. 3.7 Earth Connec�on(mandatory) Ground cable shall be connected to ground plate on grid side this prevents electric shock.
  • Page 22: Wiring System For Inverter

    3.9 Wiring System for Inverter (Region:EU) This diagram is an example for grid systems without special requirements on electrical wiring connec�on. Note: The back-up PE line and earthing bar must be grounded properly and DC Breaker effec�vely. Otherwise the back-up func�on may be abnormal when the grid fails. AC Breaker Load Battery...
  • Page 23 (Region:US) - 21 -...
  • Page 24: Typical Application Diagram Of Diesel Generator

    3.10 Typical applica�on diagram of diesel generator (Region:EU) L wire N wire PE wire G-start (7,8): dry contact signal for startup the diesel generator. Inverter Inverter coil relay open contact ① DC Breaker for battery SUN 5K-SG-EU: 150A DC breaker SUN 6K-SG-EU: 200A DC breaker SUN 7.6K-SG-EU: 200A DC breaker SUN 8K-SG-EU: 250A DC breaker...
  • Page 25: Single Phase (230Vac) Parallel Connection Diagram

    3.11 Single phase (230Vac) parallel connec�on diagram (Region:EU) L wire N wire PE wire Inverter No.3 Grid Load Parallel A Parallel B (slave) Ground Inverter ④ Inverter ① DC Grid Load No.2 Breaker ⑤ (slave) ①②③ DC Breaker for battery SUN 5K-SG-EU: 150A DC breaker SUN 6K-SG-EU: 200A DC breaker SUN 7.6K-SG-EU: 200A DC breaker...
  • Page 26: Split Phase (120/240Vac) Parallel Connection Diagram

    3.12 Split phase (120/240Vac) parallel connec�on diagram (Region:US) L wire N wire PE wire Inverter N L2 L1 N L2 L1 N L2 L1 Parallel A Parallel B No.3 Grid Load (slave) Ground Inverter Inverter ④ ① DC ⑤ N L2 L1 N L2 L1 N L2 L1 Breaker No.2 Grid...
  • Page 27 (Region:EU) L wire N wire PE wire Inverter No.3 Grid Load Parallel A Parallel B (slave) Ground Inverter ④ Inverter ① DC Grid Load No.2 Breaker ⑤ (slave) ①②③ DC Breaker for battery SUN 5K-SG-EU: 150A DC breaker SUN 6K-SG-EU: 200A DC breaker SUN 7.6K-SG-EU: 200A DC breaker SUN 8K-SG-EU: 250A DC breaker ②...
  • Page 28: Parallel Connection For 230/400 Three Phase

    3.13 Parallel connec�on for 230/400 three phase ①②③ DC Breaker for battery SUN 5K-SG-EU: 150A DC breaker SUN 6K-SG-EU: 200A DC breaker SUN 7.6K-SG-EU: 200A DC breaker SUN 8K-SG-EU: 250A DC breaker ④ AC Breaker for backup load port SUN 5K-SG-EU: 40A AC breaker SUN 6K-SG-EU: 40A AC breaker SUN 7.6K-SG-EU: 63A AC breaker SUN 8K-SG-EU: 63A AC breaker...
  • Page 29: Pcs Parallel Connection For 120/208 Three Phase

    3.14 pcs Parallel connec�on for 120/208 three phase - 27 -...
  • Page 30: Parallel Connection For 120/208 Three Phase

    3.15 Parallel connec�on for 120/208 three phase - 28 -...
  • Page 31 ①②③ DC Breaker for battery SUN 5K-SG-EU: 150A DC breaker SUN 6K-SG-EU: 200A DC breaker SUN 7.6K-SG-EU: 200A DC breaker SUN 8K-SG-EU: 250A DC breaker ④ AC Breaker for backup load port SUN 5K-SG-EU: 40A AC breaker SUN 6K-SG-EU: 40A AC breaker SUN 7.6K-SG-EU: 63A AC breaker SUN 8K-SG-EU: 63A AC breaker ⑤...
  • Page 32: Operation

    4. OPERATION 4.1 Power ON/OFF Once the unit has been properly installed and the ba�eries are connected well, simply press On/Off bu�on(located on the le� side of the case) to turn on the unit. When system without ba�ery connected, but connect with either PV or grid, and ON/OFF bu�on is switched off, LCD will s�ll light up(Display will show OFF), In this condi�on, when switch on ON/OFF bu�on and select NO ba�ery,system can s�ll working.
  • Page 33: Lcd Display Icons

    5. LCD Display Icons 5.1 Main Screen The LCD is touchscreen, below screen shows the overall informa�on of the inverter. 05/28/2019 15:34:40 8.30 -3.00 -2.00 3.00 1.The icon in the center of the home screen indicates that the system is Normal opera�on. If it turns into "comm./F01~F64"...
  • Page 34 5.1.1 LCD opera�on flow chart Solar Page Solar Graph Grid Page Grid Graph Inverter Page Main Screen Battery Page BMS Page Load Page Load Graph Battery Setting System Work Mode Grid Setting System Setup Gen Port Use Basic Setting Advanced Function Device info - 32 -...
  • Page 35: Solar Power Curve

    5.2 Solar Power Curve Solar This is Solar Panel detail page. ③ ① ① Solar Panel Genera�on. Power: 1560W Today=8.0 KWH Voltage, Current, Power for each MPPT. ② ② PV1-V: 286V PV2-V: 45V Total =12.00 KWH ③ Solar Panel energy for Day and Total. PV1-|: 5.5A PV2-|: 0.0A P1: 1559W...
  • Page 36: Curve Page-Solar & Load & Grid

    Li-BMS Mean Voltage:50.34V Charging Voltage :53.2V Batt Total Current:55.00A Discharging Voltage :47.0V Data Mean Temp :23.5C Charging current :50A Total SOC :38% Discharging current :25A Stand-by Dump Energy:57Ah Details SOC: 36% Data U:50.50V I:-58.02A Li-BMS Power: -2930W Charge Volt Curr Temp Energy Fault...
  • Page 37: System Setup Menu

    5.4 System Setup Menu System Setup This is System Setup page. System Work Mode Battery Setting Gen Port Grid Setting Basic Advanced Device Info. Setting Function 5.5 Basic Setup Menu Basic Setting Factory Reset: Reset all parameters of the inverter. Lock out all changes: Enable this menu for se�ng Time Syncs Beep...
  • Page 38: Battery Setup Menu

    5.6 Ba�ery Setup Menu Battery Setting Ba�ery capacity: it tells Deye hybrid inverter to know your ba�ery bank size. Batt Mode Use Ba� V: Use Ba�ery Voltage for all the se�ngs (V). Lithium 400Ah Batt Capacity Batt Use Ba� %: Use Ba�ery SOC for all the se�ngs (%).
  • Page 39 Generator This page tells generator output voltage, frequency, power. And, how much energy is used from generator. Power: 1392W Today=0.0 KWH Total =2.20 KWH L1: 228V Freq:50.0Hz Battery Setting Lithium Mode: This is BMS protocol.Please reference the document(Approved Ba�ery). Lithium Mode Shutdown 10%: It indicates the inverter will shutdown Batt if the SOC below this value.
  • Page 40: System Work Mode Setup Menu

    5.7 System Work Mode Setup Menu System Work Mode Work Mode Selling First: This Mode allows hybrid inverter to sell 8000 back any excess power produced by the solar panels to Selling First Max Solar Power the grid. If �me of use is ac�ve, the ba�ery energy also Work Zero Export To Load Solar Sell...
  • Page 41 Solar Sell: “Solar sell” is for Zero export to load or Zero export to CT: when this item is ac�ve, the surplus energy can be sold back to grid. When it is ac�ve, PV Power source priority usage is as follows: load consump�on and charge ba�ery and feed into grid.
  • Page 42: Grid Setup Menu

    5.8 Grid Setup Menu Grid Setting Please select the correct Grid Mode in your local area. Grid Mode General Standard If you are not sure, please choose General Standard. UL1741& IEEE1547 Grid Please select the correct Grid Type in your local area, CPUC RULE21 Set1 otherwise the machine will not work or be damaged.
  • Page 43 GEN PORT USE Generator input rated power: allowed Max. power from diesel generator. Mode AC couple on grid side GEN connect to grid input: connect the diesel generator to the Generator Input grid input port. AC couple on load side Rated Power PORT Smart Load Output: This mode u�lizes the Gen input connec�on...
  • Page 44 Advanced Function Solar Arc Fault ON: This is only for US. System selfcheck: Disable. this is only for factory. Solar Arc Fault ON Backup Delay Gen Peak-shaving: Enable When the power of the generator exceeds the rated value of it, the inverter will Func Clear Arc_Fault provide the redundant part to ensure that the generator...
  • Page 45: Mode

    5.9 Device Info Setup Menu Li-BMS Li-BMS Device Info. This page show Inverter ID, Inverter version and alarm Inverter ID: 1601012001 Flash Charge Charge Volt Volt Curr Curr Temp Temp Energy Energy Fault Fault codes. HMI: Ver0302 MAIN:Ver 0-5213-0717 Volt Volt Curr Curr...
  • Page 46 Mode III: With Smart-Load AC cable DC cable Solar Backup Load On-Grid Home Load Grid Battery Smart Load Mode IV: AC Couple On-Gen+AC couple AC cable DC cable On-Grid Home Load Grid Solar Backup Load Battery On-Grid Inverter On-Load+AC couple AC cable DC cable On-Grid Inverter...
  • Page 47: Fault Information And Processing

    On-Grid+AC couple AC cable DC cable Backup Load Solar On-Grid Inverter On-Grid Home Load Battery Grid Smart Load The 1st priority power of the system is always the PV power, then 2nd and 3rd priority power will be the ba�ery bank or grid according to the se�ngs. The last power backup will be the Generator if it is available.
  • Page 48 Error code Description Solutions 1. When inverter is in Split phase(120/240Vac) or three-phase GFDI _Relay_Failure system (120/208Vac) system, the backup load port N line needs to connect ground; 2. If the fault still exists, please contact us for help. 1. When the grid type and frequency changed it will report F13; 2.
  • Page 49 Error code Description Solutions 1. Check the backup load connected, make sure it is in allowed power range; AC Overcurrent fault 2. If the fault still exists, please contact us for help. No Utility 1. Please confirm grid is lost or not; No AC grid 2.
  • Page 50 Under the guidance of our company, customers return our products so that our company can provide service of maintenance or replacement of products of the same value. Customers need to pay the necessary freight and other related costs. Any replacement or repair of the product will cover the remaining warranty period of the product.
  • Page 51: Datasheet

    9. Datasheet SUN-5K-SG01LP1 SUN-6K-SG01LP1 SUN-7.6K-SG01LP1 SUN-8K-SG01LP1 Model -US/EU -US/EU Battery Input Date Ba�ery Type Lead-acid or Li-lon Ba�ery Voltage Range(V) 40-60V Max. Charging Current(A) 120A 135A 190A 190A Max. Discharging Current(A) 120A 135A 190A 190A Charging Curve 3 Stages / Equaliza�on External Temperature Sensor Charging Strategy for Li-lon Ba�ery Self-adap�on to BMS...
  • Page 52 SUN-5K-SG01LP1 SUN-6K-SG01LP1 SUN-7.6K-SG01LP1 SUN-8K-SG01LP1 Model -US/EU -US/EU Certifications and Standards CEI 0-21,VDE-AR-N 4105,NRS 097,IEC 62116,IEC 61727,G99,G98, Grid Regula�on VDE 0126-1-1,RD 1699,C10-11 IEC/EN 62109-1,IEC/EN 62109-2,IEC/EN 61000-6-1, EMC / Safety Regula�on IEC/EN 61000-6-2,IEC/EN 61000-6-3,IEC/EN 61000-6-4 General Data Opera�ng Temperature Range(℃) -40~60℃, >45℃ Dera�ng Cooling Smart cooling Noise(dB)
  • Page 53 10. Appendix I Defini�on of RJ45 Port Pin for BMS RS485 Pin CAN Pin 1 2 3 4 5 6 7 8 RS485 Meter_CON CANH CANL RS485A RS485B RS485 Port CAN Port - 51 -...
  • Page 54 Meter_CON port This port is used to connect the energy meter. Note: some hardware versions hybrid inverter don't support conenc�ng the energy meter 1 2 3 4 5 6 7 8 RS232 WIFI/RS232 D-GND WIFI/RS232 This RS232 port is used to connect the wifi datalogger 12Vdc - 52 -...
  • Page 55: Appendix

    11. Appendix II 1. Split Core Current Transformer (CT) dimension: (mm) 2. Secondary output cable length is 4m. Lead Outside Ver: 2.2, 2022-06-21 - 53 -...
  • Page 56 Add: No.26-30, South Yongjiang Road, Beilun, 315806, Ningbo, China Tel: +86 (0) 574 8622 8957 Fax: +86 (0) 574 8622 8852 E-mail: service@deye.com.cn Web: www.deyeinverter.com...