7. Installation details
7.1
Wrench torque sheet for installation
Outside diameter
mm
inch
φ 9.52
3/8
φ 12.7
1/2
φ 15.88
5/8
7.2
Connecting the cables
The power cord of connect should be selected according to the following specifications sheet.
Grade
Unit
24K
2
mm
2.5
7.3
Pipe length and the elevation
Pipe size
Capacity
Btu/h
GAS
24K
5/8'' (φ 16)
Caution:
Capacity is base on standard length and maximum allowance length is base of reliability.
Oil trap should be install per 5-7 meters.
10
Service manual
Torque
Kg.m
4.2
5.5
6.6
Standard
length
LIQUID
(m)
3/8'' (φ
5
9.52)
Max.
Max.
Pipe
Elevation
length
B (m)
A (m)
10
20
Additional
refrigerant
(g/m)
65
In case that
more than
5m.