Pressure Gauge Replacement; Safety Relief Valve Renewal - IDEAL INDEPENDENT COMBI 24 Installation And Servicing

Table of Contents

Advertisement

3.23 PRESSURE GAUGE REPLACEMENT

1. Refer to Section 3.8.
2. Drain the heating system. Refer to Section
3.22.
3. Remove the boiler front (See Section 3.2),
lower the control panel and remove the
control box cover.
4. Ensuring there is no pressure in the system
unclip the C clip from the flow manifold port
and remove the capillary connection together
with 'o' ring.
5. Releasing the two retaining clips on the
pressure gauge ease the pressure gauge
through the front of the control panel.
6. Fit the new pressure gauge from the front of
the control panel ensuring correct orientation.
Locate push fit connection into port ensuring
'o' ring in place and secure with the C clip.
7. Refill the boiler. Refer to Section 2.16.
8. Check that the boiler operates in both DHW &
CH modes.

3.24 SAFETY RELIEF VALVE RENEWAL

1. Refer to Section 3.8.
2. Drain the boiler. Refer to Section 3.22.
3. Remove the clip on return thermistor. Refer to Section 3.12.
4. Pull out and remove the clip (positioned behind the safety
valve) retaining the safety valve.
5. Undo the safety valve pipe compression fitting positioned
outside the boiler casing.
6. Lift out the safety valve/pipe assembly.
7. Remove the safety valve pipe and transfer to the new safety
valve.
8. Reassemble in reverse order ensuring the retaining clip is
correctly fitted, the pipe compression fitting retightened and
return thermistor is re-clipped.
9. Refill the boiler. Check that the boiler operates in both DHW
& CH modes.
50
SECTION 3 - SERVICING
4
5
3
4
Installation and Servicing

Advertisement

Table of Contents
loading

This manual is also suitable for:

Independent combi 30Independent combi 35

Table of Contents