Installation Of Indoor Unit - YMGI 86 Series Installation Instructions & User Manual

Symphony solar dc inverter single zone 09-24k, 24 & 48v dc solar powered cooling and heat pump
Table of Contents

Advertisement

INSTALLATION - INDOOR UNIT
MAKE SURE OF ENOUGH SPACE FOR INSTALLATION AND MAINTENANCE
To take into consideration the operational convenience and safety in installation, it is recommended to ensure enough
space between the unit and the walls.
Attention: If there are some additional function devices to install on the unit, be sure to add to the installation space for
the function devices.
INSTALL THE WALL MOUNTING PLATE
Prior to installing the mounting plate, check the unit and make sure the unit is in good condition and ready to install.
Check to make sure the installation location is strong enough to hold the weight of the whole unit and is in a location
that is convenient to install, maintain, service and close to the outdoor unit.
Install the indoor unit. Use enough anchor bolts to secure the mounting plates to the wall for indoor units. The
mounting plate should be level and secure and ready to receive the indoor unit.
Install Mounting Plate and Drill Hole for Combination of Copper Line/Wire Cable/Drain Hose
NOTES:
Anchors must be put into the holes, where the solid
arrows are pointing, as shown, to secure the mounting plate
firmly and to hold the weight of the indoor unit. If more
screws/anchors are required, make sure, to keep the two holes
close to each other, at least 2 inches apart.
The mounting plate should be attached to the structural
part of the wall. Minimum clearance, as shown, is required to
ensure proper airflow and allows enough room for easier
service.
Steps to Mount Plate
Mark all drill positions. At least 8 anchor holes are required, 2 at each of the 4 perimeter corners of the plate. These
are needed to secure the plate, where the bold arrows are pointing, as shown in the picture above. Refer to the
specification sheet for unit weight so that enough anchors are installed at the proper locations.
Pre-drill guiding holes which are marked for anchors or screws on the wall.
Confirm the position of the holes and finish drilling to the depth required for anchors (NOT for screws).
Align the mounting plate holes with the holes drilled on the wall and put anchors or screws into the holes to secure the
mounting plate.
YMGI: Your Modern Green Idea
YMGI, Engineered Comfort Products for A Sustainable and Efficient Green World!
30

Advertisement

Table of Contents
loading

Table of Contents