Summary of Contents for Pentair Jung Pumpen BAUFIX 100
Page 1
BAUFIX 100 EN Instruction Manual www.pts-jung.co.uk B 47218.20-2020.03...
Page 4
ENGLISH You have purchased a product made by Pentair Jung Pum- General danger to people pen and with it, therefore, also excellent quality and service. Secure this service by carrying out the installation works Warning of electrical voltage in accordance with the instructions, so that our product NOTICE! NOTICE! Danger to equipment and operation can perform its task to your complete satisfaction.
Page 5
Connect up the pressure pipe with a DN32 PVC pipe socket (to be supplied by the user). 3. After connecting the required pipes, align the Baufix 100 and fill in with earth. The entire cover must remain in the Baufix to prevent dirt from getting in.
Page 6
ENGLISH Accessory guide rail system GR32 For the pumps U3KS, U5KS and U6KS is as an accessory guide rail system available that can be mounted in the Baufix. A sim- ple pull out and lowering the pump is possible. Accessory alarm device The alarm device signals an excessive high water level.
Page 7
BAUFIX 100 (JP47214) Spare parts ① Abdeckplatte Cover JP48245 ② Abdeckrahmen Frame JP48244 ③ Dichtprofil Profiled joint JP47394 ④ Anschluss-Set Connecting kit JP47960 ⑤ Behälter Sump JP47961...
Need help?
Do you have a question about the BAUFIX 100 and is the answer not in the manual?
Questions and answers