SPECIFICATIONS
120
45
150
Ø80
OPERATING CONDITIONS
1. Water supply pressure : 0.05 ~ 0.75 MPa.
2. Ensure that water supply is clean ( No Sand, Dirt, Etc.).
MAINTENANCE
1.
All Finishes : Clean the finish with mild soap and warm water.
Wipe entire surface completely dry with clean soft cloth. Many
cleaners may contain chemicals, such as ammonia, chlorine,
toilet cleaner etc. which could adversely affect the finish and
are not recommended for cleaning
2.
Handle reinstallation
Handle Set *
* Red handle for left side and blue handle for right side. Tighten by hand
S06435MR
"EGO II" CROSS HANDLE FLOOR STANDING BATH
INSTALLATION
1
Make sure the floor is flat
3
258
6 - Hole 8
Ø72.5
5
G½
Ø8
* Cover
Mortar
* Remove the cover after the
mortar has dry
7
Packing
Body
Nut *
* Turn the nut
2
Base
Hot Water
4
Supply *
Cold W ater
Supply *
Base
Drill
Sleeve
Anchor
* Pipe supplied by owner
6
Maximum
Mortar
Ring
Minimum
Mortar
Hanger
Cover
Nut
Flexible
Hose
8
Massage
Spray Button
Rain Spray
Button
Shower
Flexible Hose
w/ Packing
& SHOWER SET
TROUBLESHOOTING
PROBLEM
Unsatisfactory spray
Flow rate unsatisfactory
Water leaks around the handle
Flow Regulator Inside
1. NOZZLES
Screw
2. AERATOR
3. CERAMIC
HEAD WORK
ATTENTION
1.
Don t use abrasive cleaners or solvents on faucets and fittings.
2.
Flow Regulator should not be remove because it could damage the
system
3.
As the product model is constantly updated, the actual product may
not look the same as it shown in the diagram, but the basic
installation principles are the same.
4.
The hot water supply side of the faucets is in a condition of high
temperature. Do not allow skin to contact with the hardware surface
directly. Otherwise, scalding may occur.
TX445SECMV3
CHECK
SOLUTION
POINT
1
Clean
2
Remove and clean
3
Tighten
(Don t remove)
R5
Need help?
Do you have a question about the EGO II TX445SECMV3 and is the answer not in the manual?
Questions and answers