UPS2000-G-(1 kVA–3 kVA) Battery Pack
Quick Guide
----End
3.3.2 Tower-mounted Installation
Procedure
Step 1 Remove the front panel.
Step 2 Adjust the battery pack panel as shown in the following figure.
Issue 05 (2022-05-23)
NO TE
The recommended torque for tightening the screws is 3 N·m.
Copyright © Huawei Digital Power Technologies Co., Ltd.
3 Installing a Battery Pack
10