Operation; Preparation And Caution Before Measurement; Front Panel Description - Elenco Electronics M-1000E Operator's Instruction Manual

Table of Contents

Advertisement

5. Operation

5-1 Preparation & Caution Before Measurement
1. The function switch should be set to the range to be
measured before operation. If the function must be
switched during a measurement, always remove the test
leads from the circuit being measured.
2. If the unit is used near noise-generating equipment, be
aware that the display may become unstable or indicate
large errors.
3. Avoid using the unit in places with rapid temperature
variations.
4. In order to prevent damage or injury to the unit, never
fail to keep the maximum tolerable voltage and current,
especially for the 10A current range.
5. Carefully inspect the test leads. If damaged, discard and
replace.
6. Be sure to check the annunciator on the display for
safety indicator.

5-2. Front Panel Description

1. Liquid crystal display
2. Function / rotary switch
3. TR h
test socket
FE
4. 10A input jack
5. Plug-in connector for red (positive) test lead.
6. Plug-in connector for black (negative) test lead.
-8-
1
2
3
h
test
FE
socket
-9-
4
5
6

Advertisement

Table of Contents
loading

Table of Contents