Huawei LUNA2000-2.0MWH Series User Manual page 127

Smart string ess
Hide thumbs Also See for LUNA2000-2.0MWH Series:
Table of Contents

Advertisement

LUNA2000-2.0MWH Series Smart String ESS
User Manual
Figure 5-6 Before installing the socket
(1) Cable binding position
Step 1 Select a 110 V or 220 V socket as required.
Step 2 Connect the live wire and neutral wire.
Issue 08 (2022-11-15)
Installing a 110 V socket
a.
Connect the live wire and neutral wire from the mains to positions 1 and
2 of the XT9 terminal block.
Figure 5-7 Connecting the live wire and neutral wire from the mains
b.
Connect the live wire (corresponding to cable 1751) and neutral wire
(corresponding to cable 1752) from the lower end of the switch to
positions 1 and 3 of the XT1 terminal block.
Copyright © Huawei Technologies Co., Ltd.
5 Installing Cables
117

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents