START-UP CHECKLIST FOR 581K*04-06F/K SINGLE PACKAGE ROOFTOP
NOTE: To avoid injury to personnel and damage to equipment or
property when completing the procedures listed in this start-up
checklist, use good judgment, follow safe practices, and adhere to
the safety considerations/information as outlined in preceding
sections of this Installation Instruction document.
I. PRELIMINARY INFORMATION
MODEL NO. ____________________________________________
JOB NAME _____________________________________________
SERIAL NO. ____________________________________________
ADDRESS _____________________________________________
START-UP DATE________________________________________
TECHNICIAN NAME _____________________________________
ADDITIONAL ACCESSORIES
_____________________________________________________________________________________________________
II. PRE-START-UP
Verify that all packaging materials have been removed from unit
Verify installation of outdoor air hood
Verify installation of flue exhaust and inlet hood
Verify that condensate connection is installed per instructions
Verify that all electrical connections and terminals are tight
Verify gas pressure to unit gas valve is within specified range
Check gas piping for leaks
Verify the gas orifice placement dimension (Ultra Low NOx models only)
is as shown in the gas piping section
Check that indoor-air filters are clean and in place
Check that outdoor air inlet screens are in place
Verify that unit is level
Verify that fan assembly is free of obstructions and rotor spins freely
Verify that scroll compressors are rotating in the correct direction
Verify installation of thermostat
Verify that crankcase heaters have been energized for at least 24 hours
III. START-UP
ELECTRICAL
Supply Voltage
Compressor Amps 1
Compressor Amps 2
Supply Fan Amps
TEMPERATURES
Outdoor-air Temperature
Return-air Temperature
Cooling Supply Air Temperature
Gas Heat Supply Air
Manufacturer reserves the right to change, at any time, specifications and designs without notice and without obligations.
GAS HEATING/ELECTRIC COOLING UNIT
(Remove and use for job file)
L1-L2_____________
L1 _____________
L1 _____________
L1 _____________
_____________ °F DB (Dry Bulb)
_____________ °F DB
_____________ °F
_____________ °F
(Y/N) _____
(Y/N) _____
(Y/N) _____
(Y/N) _____
(Y/N) _____
(Y/N) _____
(Y/N) _____
(Y/N) _____
(Y/N) _____
(Y/N) _____
(Y/N) _____
(Y/N) _____
(Y/N) _____
(Y/N) _____
(Y/N) _____
L2-L3_____________
L2 _____________
L2 _____________
L2 _____________
_____________ °F WB (Wet Bulb)
L3-L1_____________
L3 _____________
L3 _____________
L3 _____________
Form No: II581K-F-4-6-01 Rev. A
CL-1
Replaces: New

Advertisement

Table of Contents
loading

This manual is also suitable for:

581k 04f series581k 05f series581k 06f series

Table of Contents