Mitsubishi Electric PUHZ-ZRP100VKA3 Service Manual page 24

Hide thumbs Also See for PUHZ-ZRP100VKA3:
Table of Contents

Advertisement

PUHZ-ZRP200YKA2.UK
Refrigerant GAS pipe
<Blazing>
connection [25.4([1 inch)
Refrigerant LIQUID pipe
ZRP200 : connection [9.52([3/8 inch)
ZRP250 : connection [12.7([1/2 inch)
OCH645
PUHZ-ZRP250YKA2.UK
Charge plug
(High pressure)
Ball valve
Strainer
4-way valve
#50
Charge plug
(Low pressure)
Accumulator
Strainer
#100
Oil return hole
with strainer #40
Strainer
#100
Stop valve
(with service port)
Thermistor TH6
(2-phase pipe)
High pressure
switch 63H
Muffler
Thermistor TH32
(Comp. surface)
Compressor
Strainer
Linear expansion valve A
#100
24
Unit: mm (inch)
Refrigerant flow in cooling
Refrigerant flow in heating
Heat exchanger
Thermistor TH7
(Ambient)
Distributor
Thermistor TH3
(Liquid)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents