LOGBOOK FOR INSTALLATION, COMMISSIONING AND MAINTENANCE
Datasheet
COMMISSIONING INFORMATION
BOILER PRIMARY SETTINGS (INDIRECT HEATING ONLY) ALL BOILERS
IS THE PRIMARY SYSTEM SEALED UNVENTED OR OPEN VENT-
ED?
WHAT IS THE BOILER FLOW TEMPERATURE?
ALL SYSTEMS WITH MAINS PRESSURE
WHAT IS THE INCOMING STATIC COLD WATER PRESSURE AT
THE PRESSURE REDUCING VALVE INLET?
WAS THE STRAINER (IF FITTED) CLEANED OF INSTALLATION
RESIDUES?
HAS A WATER SOFTENER BEEN INSTALLED?
WHICH TYPE OF WATER SOFTENER HAS BEEN INSTALLED?
SEALED UNVENTED SYSTEMS
HAVE A COMBINED TEMPERATURE AND PRESSURE LIMITING
VALVE AND EXPANSION VALVE BEEN FITTED AND DISCHARGE
TESTED?
IS THERE A SHUTDOWN DEVICE FOR THE PRIMARY ENERGY
SOURCE (NORMALLY A 2-WAY VALVE)?
HOW IS THE PRESSURE REDUCING VALVE SET (IF FITTED)?
WHERE IS THE PRESSURE REDUCING VALVE LOCATED?
HAS THE EXPANSION VESSEL OR THE INTERNAL AIR SPACE
BEEN CHECKED?
WHAT IS THE DHW TEMPERATURE AT THE NEAREST OUTLET? °C
ALL PRODUCTS
DOES THE DHW SYSTEM COMPLY WITH THE RELEVANT
BUILDING REGULATIONS?
HAS THE SYSTEM BEEN INSTALLED AND COMMISSIONED AC-
CORDING TO THE MANUFACTURER'S INSTRUCTIONS?
HAVE YOU SHOWN THE CUSTOMER HOW TO OPERATE THE
CONTROLS?
HAVE YOU HANDED OVER ALL MANUFACTURER'S DOCU-
MENTS TO THE CUSTOMER?
CONTRACTOR SIGNATURE
CUSTOMER SIGNATURE
(To confirm demonstration of the appliances and receipt of
the instruction manual)
PLEASE FOLLOW THE INSTRUCTIONS ON INSTALLATION AND COMMISSIONING IN THE OPERATING AND INSTALLATION INSTRUCTIONS
SUPPLIED WITH THE APPLIANCE (this document)
18
| ESH Trend GB
SEALED UNVENTED
OPEN VENTED
°C
bar
Yes
No
Yes
No
Yes
No
Yes
No
bar
Yes
No
Yes
Yes
Yes
Yes
www.stiebel-eltron.co.uk

Advertisement

Table of Contents
loading

Table of Contents