SECTION 3: INSTALLATION

Pre-Installation Inspection

Purpose
To familiarize the installer/operator with the UV Systems
Lines' components, to assure proper delivery of all the
system's components and to inspect each component
for shipping damages.
Frequency
To be conducted prior to installation.
Parts and Required Equipment
• Adjustable Wrench or 1.5" Socket
• Box Cutter
• Flashlight
During pre-installation there is a general risk due
to load.
Quartz Sleeves and UV Lamps are fragile and
potentially dangerous if broken. Handle with care.
Procedure
NOTE: Vessel are shipped with their quartz sleeves
assembled.
NOTE: UV Lamp(s) are shipped in a separate package
either inside the vessel crate or separately.
1. Unpack and inspect vessel for shipping damage. A
box cutter may be needed to unpack the UV System.
2. Conduct an internal, visual inspection of models
shipped with their quartz sleeves assembled. A
flashlight will help with the internal inspection.
The UV System consists of:
• Quartz Sleeve Module (QSM) Faceplate
(assembled on Vessel)
• QSM Faceplate Gasket (assembled on Vessel)
• Quartz Sleeve Retainer Nut
(one for each quartz sleeve)
• Quartz Sleeve O-RIng
(one for each quartz sleeve retainer nut)
• Drain Valve Assembly
• Quartz Sleeve (one for each UV Lamp)
• UV Lamp(s)
• Vessel
• Bolt(s) (assembled on Vessel)
• Nut(s) (assembled on Vessel)
• Washer(s) (assembled on Vessel)
• 4-Pin Connector(s) (attached to lamp cables)