Power Supply Installation - Pentair BIOSHIELD PRO User Manual

Table of Contents

Advertisement

Available languages

Available languages

SECTION 3: INSTALLATION
Mounting Power Supplies (Ballasts)
The BioShield
PRO UV System's power supply should
®
always be mounted to a surface which does not expose
the power supply to standing water.
NOTE: DO NOT mount the power supply in an
extremely confined space where heat and moisture
can be retained.
• Four screws, one in each corner of the power supply,
secure the power supply to the wall or shelf.
Mounting Interconnect Box
The Interconnect Box should be mounted in a location
that is accessible by both flow switch and ballast. See
the figure on this page for cable distances.
• Four screws, one in each corner of the power supply,
secure the power supply to the wall.
BioShield® PRO UV System Installation and User's Guide
11

Advertisement

Chapters

Table of Contents
loading

Table of Contents