Fein CCG18-125-15 AS Series Manual page 37

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 30
OBJ_BUCH-0000000502-001.book Page 37 Thursday, January 12, 2023 12:06 PM
Operating unit
The operating unit is used for speed preselection as
well as for status display of the power tool.
(4)
(5)
(6)
Battery charge-control indicator (1)
Indication
Meaning/Corrective action
green
Battery charged.
yellow
Battery almost empty. Replace battery
soon.
red
Battery empty. Replace or charge bat-
tery.
Kickback monitoring indicator (2)
Indication
Meaning/Corrective action
red
Sudden kickback of power tool
detected. Switch power tool off and
check application tool for damage.
Power tool status indicator (3)
Indication
Meaning
green
Status OK.
yellow
Temperature critical or battery almost
empty.
red lit
Overload protection has tripped,
power tool overheated or battery
empty.
red flashing
Restarting protection, kickback moni-
toring or fall down monitoring has
actuated.
Temperature indicator (4)
Indication
Meaning/Corrective action
yellow
Temperature critical. Operate power
tool at no load and allow it to cool
down.
red
Power tool overheated and switches
off. Allow power tool to cool down.
Speed stage indicator (5)
Indication
Meaning
1
3400 /min
2
6600 /min
(1)
3
9800 /min
(2)
Speed preselection button (6)
The speed stage is set in the following sequence:
(3)
1 - 2 - 3 - 2 - 1 - 2 - ...
Adjustment is also possible during operation.
Charge-control Indicator on the Battery
(see page 13).
The charge condition can be indicated by the green
LEDs of the charge-control indicator on the battery.
Press the charge-control indicator button
to indicate the charge condition.
When no LED lights up after pressing the charge-con-
trol indicator button, the battery is defective and must
be replaced.
Transport.
The recommended Li-ion batteries are subject to the
Dangerous Goods Legislation requirements. The user
can transport the batteries by road without further
requirements.
When being transported by third parties (e.g.: air trans-
port or forwarding agency), special requirements on
packaging and labelling must be observed. For prepara-
tion of the item being shipped, consulting an expert for
hazardous material is required.
Dispatch batteries only when the housing is undam-
aged. Tape or mask off open contacts and pack up the
battery in such a manner that it cannot move around in
the packaging. Please also observe possibly more
detailed national regulations.
Repair and customer service.
Please observe that power tools may only be
repaired, maintained and inspected by qualified
electricians, as improper maintenance can result in con-
siderable hazards for the user.
When working metal under extreme oper-
ating conditions, it is possible for conductive
dust to settle in the interior of the power
tool. Blow out the interior of the power tool via the
ventilation slots frequently with dry and oil-free com-
pressed air.
When working materials containing gypsum, dust may
occur. This dust can settle inside the power tool as well
as on switching elements and harden in combination
with humidity. As a result, the switching mechanism
may be impaired.
Blow out the interior of the power tool frequently
through the ventilation openings and switching ele-
ments using dry, oil-free compressed air.
en
37
or

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ccg18-125-15 x as series7 122 09 series7 122 10 series

Table of Contents