Preparing For Installation; Safety Recommendations; Site Preparation; Installation Accessories - H3C WA6120H Installation Manual

Table of Contents

Advertisement

Preparing for installation

Safety recommendations

WARNING!
Only designated authorized technical personnel can install and remove the AP and its accessories.
You must read all safety instructions carefully before working with the AP.
To avoid possible bodily injury and equipment damage, read the following safety recommendations
before installing the AP. Note that the recommendations do not cover every possible hazardous
condition.
To avoid bodily injury and device damage, take adequate safety measures.
Place the AP in a dry and flat location and take anti-slip measures.
Keep the AP clean and dust-free.
Do not place the AP in a moist area and avoid liquid intrusion.
Keep the AP and installation tools away from walkways.

Site preparation

To ensure that the AP will operate in a favorable environment, examine the installation site before
installing the AP. Make sure the temperature and humidity at the installation site meet the
requirements in
Table 1 Temperature and humidity requirements
Item
Operating temperature
Storage temperature
Operating humidity

Installation accessories

Figure 1 Accessories provided with the AP

Installation tools

When installing the AP, you might need the following tools. Prepare the installation tools yourself as
required.
Table
1.
Specification
0°C to 40°C (32°F to 104°F)
–40°C to +70°C (–40°F to +158°F)
5% RH to 95% RH, noncondensing
1

Advertisement

Table of Contents
loading

Table of Contents