Stack Ab1000 - Zendure SolarFlow ZDSPVH1200 User Manual

Smart pvhub 1200 controller
Hide thumbs Also See for SolarFlow ZDSPVH1200:
Table of Contents

Advertisement

Available languages

Available languages

1
2
1
4
Mark Location, Find a position next to PVHub, one person fixes the
1
microinverter on the wall with his hands, and the other person marks
the positions of the two screw holes of the microinverter with a marker.
Drilling,drill two diameter 8mm mounting holes at the two marked
2
positions.
Installing yellow plastic expansion tube of screws,Respectively Install
3
the yellow plastic expansion screw tube into the two holes which step
3 drilling.
Installing microinverter, One person fixes the microinverter with both
4
hands on the wall and align the hole drilling in step 3, then put the flat
Washers on the screws,at last screw
into the yellow plastic expansion tube .
Tighten the screws,screws the rest of
5
wall completely.Then you also have completed the installation of
microinverter.

5.3.6 Stack AB1000

Before stacking AB1000, please pay attention to the note on the top of
AB1000
1
Remove the plastic protective covers on the connection port ,then
1
please align the left side first.
Slowly insert the battery connection port.
2
2
1
2
5
&
screws with flat Washer
1
2
&
1
2
2
2
2
1
1
3
screw into the
EN
11

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Zdab1000Ab1000

Table of Contents