Download Print this page

SRC R-HM18-14-01-SL Quick Start Manual page 4

Large side stand – royal enfield himalayan

Advertisement

Copyright By SRC
Design and Specification are subjected to change
Step 3:
Slide in the 4 Screws (4), as shown in the drawing, and
ensure it is aligning all the 3 plates as a cluster and
secure the threads using the 4 Nuts (5), as shown in the
drawing.
Step 4:
The threads can be tightened to the
torque, as given in the table.
The above drawing represents the "As Is
Mounted Condition" of the Large Side
Stand. It improves the foot print of the
OE feature and improves the static
stability, when the Motorbike is parked
using the Side stand.
Page 4

Advertisement

loading