Wired Controller Installation; Wiring Work - Gree GMV-ND36ZD/A-T Owner's Manual

Multi variable air conditioners, floor and ceiling type indoor unit
Hide thumbs Also See for GMV-ND36ZD/A-T:
Table of Contents

Advertisement

4.3.3 Test of Drainage System
(1) Please test drainage system after electric work is finished. Inject approximately 1L
purified water to drain pan from air vent, ensure that not to splash the water over the
electrical components (e.g. water pump. etc.).
(2) During the test, please carefully check the drainage joint and make sure no any leakage
occur.
(3) It's strongly recommended to do the drain test before ceiling decoration.

4.4 Wired Controller Installation

Wired controller is optional accessory. If wired controller is needed, please contact your
local dealer and install the wired controller according to the instruction manual.
Note:
Do perform the commissioning operation before first use, automatic addressing or other
settings, please refer to the manual of ODU.

5 Wiring Work

Notes:
① Units must be grounded securely, or it may cause electric shock.
② Please carefully read the wiring diagram before carry out the wiring work, incorrect
wiring could cause malfunction or even damage the unit.
③ The capacity of power supply must be sufficient and the sectional area of wires in the
room should be above 2.5 mm
Multi Variable Air Conditioners Floor and Ceiling Type Indoor Unit
Fig.4.3.2.6
Fig.4.3.3
.
2
14

Advertisement

Table of Contents
loading

Table of Contents