Installation
Figure 28. Condensate trap installation
Note: Minimum if unit static is higher trap must be taller to
drain appropriately.
Drain Pan Removal (Units with
Condensate Overflow Switch Option)
Before drain pan removal, the switch wire must be
disconnected from wire tie on panel and/or any tape before
drain pan can be removed.
Care must be taken so the wire does not catch on the
bottom of indoor coil or any protrusion.
Filter Installation
The quantity of filters is determined by unit size. Refer to
General Data section in Packaged Rooftop Air
Conditioners Precedent™ Heat Pump Standard Efficiency
12.5 to 25 Tons — 60 Hz product catalog (PKGP-
PRC019*-EN). Access to the filters is obtained by removing
the filter access panel.
Note: Do not operate the unit without filters.
Field Installed Power Wiring
WARNING
Proper Field Wiring and Grounding
Required!
Failure to follow code could result in death or serious
injury.
All field wiring MUST be performed by qualified
personnel. Improperly installed and grounded field
wiring poses FIRE and ELECTROCUTION hazards. To
avoid these hazards, you MUST follow requirements
for field wiring installation and grounding as
described in NEC and your local/state/national
electrical codes.
An overall dimensional layout for the field installed wiring
entrance into the unit is illustrated in the Dimensions and
Weights chapter. To insure that the unit's supply power
28
38.1
wiring is properly sized and installed, follow the following
guidelines.
Verify that the power supply available is compatible with
the unit's nameplate ratings. The available supply power
must be within 10% of the rated voltage stamped on the
nameplate. Use only copper conductors to connect the
power supply to the unit.
NOTICE
Use Copper Conductors Only!
Failure to use copper conductors could result in
equipment damage as the equipment was not
designed or qualified to accept other types of
conductors.
Important: If the unit is not equipped with an optional
factory installed non-fused disconnect switch
or circuit breaker, a field supplied disconnect
switch must be installed at or near the unit in
accordance with the National Electrical Code
(NEC latest edition).
Main Unit Power
WARNING
Proper Field Wiring and Grounding
Required!
Failure to follow code could result in death or serious
injury.
All field wiring MUST be performed by qualified
personnel. Improperly installed and grounded field
wiring poses FIRE and ELECTROCUTION hazards. To
avoid these hazards, you MUST follow requirements
for field wiring installation and grounding as
described in NEC and your local/state/national
electrical codes.
WARNING
Hazardous Voltage!
Failure to disconnect power before servicing could
result in death or serious injury.
Disconnect all electric power, including remote
disconnects before servicing. Follow proper lockout/
tagout procedures to ensure the power can not be
inadvertently energized. Verify that no power is
present with a voltmeter.
Standard Wiring
1. Location of the applicable electrical service entrance is
illustrated in the Dimensions and Weights chapter.
Complete the unit's power wiring connections at HTB1
main power terminal block in unit control panel. Refer to
the customer connection diagram that is shipped with
the unit for specific termination points.
2. Provide proper grounding for the unit in accordance
with local and national codes.
PKGP-SVX010B-EN