Tanita DC-430MA III Instruction Manual page 7

Body composition analyzer
Table of Contents

Advertisement

Scheduled Maintenance
TANITA recommends that each facility conduct periodic checks of each unit.
1. Check the following at least daily:
• The unit is on a stable and level surface ie on a fi rm fl ooring, not on a thick carpet
• Date and time settings
2. Visually inspect the following at least weekly:
• The display for any damage or contamination
• All cables, cords, and connector ends for damage or contamination
• All safety-related labeling for legibility
• All accessories (electrodes, etc.) for wear or damage
3. Visually inspect the following at least monthly:
• Mounting screws on stand
Update settings, replace items, or call for service as necessary according to the results of the visual
inspections. Do not use the unit if you see any signs of damage. Equipment that has been damaged
must be checked for proper operation by qualifi ed personnel before using again.
7 7

Advertisement

Table of Contents
loading

Table of Contents