Table 8-20 Gre Tunnel Parameters; Figure 8-24 Gre Tunnel Page - Nokia ONT XS-2426X-A Product Manual

Table of Contents

Advertisement

Configure a XS-2426X-A indoor ONT
Network configuration
Configuring GRE tunnel

Figure 8-24 GRE Tunnel page

2
Configure the following parameters:

Table 8-20 GRE Tunnel parameters

Field
Tunnel Name
WAN Interface
Primary Remote End
Secondary Remote End (optional)
Connected Remote End
Connectivity check
Traffic timeout to start pings
No. of retries before unreachable
December 2021
Issue 1
Description
Select Create new GRE Tunnel or select an existing tunnel from the list.
The tunnel name is automatically assigned by the system.
Up to 4 GRE tunnels are supported.
Select a WAN interface from the list.
GRE tunnels can only be created on HSI-enabled WAN interfaces.
Enter an IP address or FQDN that is unique in the system.
If the primary remote endpoint is down or unreachable, the secondary remote endpoint
becomes active, if configured.
The secondary remote endpoint remains active until it becomes unreachable, in which
case the primary remote endpoint becomes active again. Revertive mode is not
supported.
If both endpoints are unreachable, the GRE tunnel is declared down.
This field displays the current data traffic path for the GRE tunnel.
This feature is automatically selected by the system.
Enter the traffic timeout in seconds (2 to 1024).
Enter the number of retries before the tunnel is declared down (0 to 100).
© 2021 Nokia. Nokia Confidential Information
Use subject to agreed restrictions on disclosure and use.
3FE-49546-AAAA-TCZZA
Nokia ONT
115

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents