Tiger LOG STORE General Assembly Instructions

Advertisement

TIG/INS67
TIGER
LOG STORE
GENERAL ASSEMBLY
INSTRUCTIONS

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the LOG STORE and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Tiger LOG STORE

  • Page 1 TIG/INS67 TIGER LOG STORE GENERAL ASSEMBLY INSTRUCTIONS...
  • Page 2 BEFORE YOU GET STARTED PLEASE READ INSTRUCTIONS CAREFULLY • Check the pack and make sure you have all the parts listed. • When you are ready to start, make sure you have the right tools at hand (not supplied). • Ensure there is plenty of space and a clean dry area for assembly. TIMBER As with all natural materials, timber can be affected during various weather conditions.
  • Page 3 Please retain instructions for future reference CAUTION: CAUTION: All buildings should be erected It is advisable to wear safety by two competent adults. gloves during building installation. Whilst all products manufactured are made to the highest standards of safety, we cannot accept responsibility for your safety whilst erecting or using this product.
  • Page 4 BEFORE YOU GET STARTED TOOLS REQUIRED We recommend using the following tools (not supplied): HAMMER DRILL SCREWDRIVER + SHARP KNIFE SPIRIT LEVEL FIXING KIT CONTENTS: Screws Nails (50mm Galvanised - QTY 32) (40mm Galvanised - QTY 10) Screws (80mm Galvanised - QTY 8) ASSEMBLY •...
  • Page 5 Customer Support or use the ‘Items Delivered Query’ form at tigersheds.com/contact. Unpacking The Log Store. • Carefully remove all packaging and remove the log store components. NOTE: PARTS MAY HAVE BECOME LOOSE OR MOVED DURING TRANSPORTATION. • Lay components on a dry, horizontal surface.
  • Page 6 TIGER LOG STORE GENERAL INSTRUCTIONS Step 1: GABLE PANEL SHELF & GABLE ASSEMBLY: • Lay down shelf on its side and line up two gable panels. (Detail A) • Secure using 1x S80 through the shelf and into the gable panels.
  • Page 7 • Use 4x S50 to attach the back boards to the gable panels. • Line up back boards with the boards on the gable panels. (Detail E) NOTE: CHECK LOG STORE IS SQUARE AS YOU BUILD. BACK BOARD GABLE PANEL Step 4: ATTACH FASCIA BOARDS: •...
  • Page 8 TIG/INS67 Display Agent Woodlands DIY Store Station Yard, Horsforth, Leeds, LS18 5NZ Telephone: 0113 205 4189 Website: tigersheds.com Email: customersupport@tigersheds.com...

Table of Contents