Download Print this page
H3C SR8800-X Quick Start Installation
Hide thumbs Also See for SR8800-X:

Advertisement

Quick Links

H3C SR8800-X Routers Installation Quick Start-6PW105
This document provides a brief guide for installing H3C SR8800-X routers. For more installation
information, see H3C SR8800-X Routers Installation Guide.
The figures in this document are for illustration only.
The installation procedure is similar for the SR8800-X routers. The following uses an SR8808-X
router as an example unless otherwise specified.
Paper manuals cannot be updated in real time with product changes.For most recent product
information,see the E-manuals at the official website.
Safety recommendations
To avoid equipment damage or bodily injury, read the following safety recommendations before installation.
Note that the recommendations do not cover every possible hazardous condition.
To prevent ESD damage, always wear an ESD wrist strap when working with the router, cards, or PCBs.
Make sure the trap is reliably grounded.
Do not install the router, FRUs, or cables with the power on.
To avoid equipment damage or bodily injury, make sure the router is reliably grounded before powering on
the router.
To ensure good ventilation, install a filler panel in an unused slot.
Tool list
Prepare the following installation tools yourself as required.
Flat-blade
Phillips
Needle-nose
screwdriver
screwdriver
pliers
Marker
Wire-stripping
pliers
Diagonal
Claw hammer
pliers
BOM:
3104A0FU
Installation accessories
This section only lists the most commonly used installation accessories.
Grounding cable
ESD wrist strap
M6 screw
Installing the router
Attaching cage nuts to the rack
Use a pattern tool to record the installation holes of the mounting brackets and mark the cage nut holes
in the rack posts accordingly.
Install cage nuts on the marked square holes.
Removable cable tie
Cage nut

Advertisement

loading

Summary of Contents for H3C SR8800-X

  • Page 1 BOM: 3104A0FU Installation accessories This document provides a brief guide for installing H3C SR8800-X routers. For more installation information, see H3C SR8800-X Routers Installation Guide. This section only lists the most commonly used installation accessories. The figures in this document are for illustration only.
  • Page 2 Installing the router in a rack Grounding the router Connect the grounding cable to the grounding system in the equipment room. Do not connect it to a Do not hold the handle of the fan tray, power module, or the back panel of the chassis, or the air fire main or lightning rod.
  • Page 3 Installing interface modules Connecting a power cord Connecting an AC power cord Before installing an interface module, make sure the connectors on the module are not broken or blocked. Make sure the circuit breaker at the power input end is off when you connect the AC power cord to the terminals on the power source.
  • Page 4 Make sure the power cords are connected correctly and the power source is operating correctly. Then power on the router. Verify that the router is operating correctly by observing the LEDs on the router. For more information about the LEDs, see H3C SR8800-X Router Installation Guide. Copyright 2017-2023, New H3C Technologies Co., Ltd.