Guidelines For Wiring A 2U4N Configuration In A 3-Phase Cabinet; Connectors On Rear Of Servers; Guidelines For Wiring A 2U4N Configuration In A 3-Phase - Dell 100 Series Hardware Installation Manual

Hide thumbs Also See for 100 Series:
Table of Contents

Advertisement

Wiring Diagrams for a 2U4N Configuration in a Cabinet with 3-Phase Delta or 3-Phase Wye Power Distribution

Guidelines for wiring a 2U4N configuration in a 3-phase

cabinet
VxRack Node Hardware Installation Guide
94
Use the following illustration as reference for connectors on rear of the servers:
Figure 39 Connectors on rear of servers
Use the wiring diagrams to connect power, management, and data cables.
As cables are installed and connected, dress and tie cables frequently so that excess
slack does not interfere with routing of adjacent cables.
Install and connect cables in the following order:

Advertisement

Table of Contents
loading

Table of Contents