Guidelines For Wiring A 2U1N Configuration; Connectors On Rear Of Servers - Dell 100 Series Hardware Installation Manual

Hide thumbs Also See for 100 Series:
Table of Contents

Advertisement

Wiring Diagrams for a 2U1N Configuration

Guidelines for wiring a 2U1N configuration

VxRack Node Hardware Installation Guide
50
Use the following illustration as reference for connectors on rear of the servers:
Figure 22 Connectors on rear of servers
Use the wiring diagrams to connect power, management, and data cables.
As cables are installed and connected, dress and tie cables frequently so that excess
slack does not interfere with routing of adjacent cables.
Install and connect cables in the following order:
Power (as cabinet applicable):
l
Single-phase
Single-phase wiring for 2U1N configuration
n
3-Phase delta
Three-phase delta wiring for 2U1N configuration
n
3-Phase wye
Three-phase wye wiring for 2U1N configuration
n
Management
Management network wiring for 2U1N configuration
l
Data A
Data network A wiring for 2U1N configuration
l
Data B
Data network B wiring for 2U1N configuration
l
on page 51
on page 53
on page 55
on page 57
on page 60
on page 63