QUICK START GUIDE
Elevator Control Panel &
Elevator Floor Expansion Board
Applicable Model: EC16 & DEX16
Version: 1.0
Date: March 2023

Advertisement

loading

Summary of Contents for ZKTeco EC16

  • Page 1 QUICK START GUIDE Elevator Control Panel & Elevator Floor Expansion Board Applicable Model: EC16 & DEX16 Version: 1.0 Date: March 2023...
  • Page 2 Cautions Please note the following cautions. Mis-operation may lead to personal injury or equipment failure: Other Notes: 1) RESET button: Long press 1 to 5 seconds for U disk upgrade; 5 to 10 seconds to restart the controller; 10 seconds or more to restore the factory settings. When restoring the factory settings, only the network configuration of the device is restored, other data is not restored.
  • Page 3: Led Indicators

    LED Indicators After connecting the main controller correctly, turn on the system power, the LED indicators in normal condition is described as follows. 1. LED indicators on the Enclosure PWR indicator (red): Solid Red LED indicates normal energization. COMM indicator (yellow): Slowly flashing Yellow LED indicates data communication is in pr ogress.
  • Page 4 System Equipment Composition The elevator controller system is composed of the following equipments. 19 20 DEX16 Expansion Board EC16 Master Control Panel 9.1*6.5inch (230*165mm) 5.2*6.5inch (132*165mm) Description Description Floor Button Control Port FIRE Extend Port Emergency Button Wiegand Manual Button...
  • Page 5: System Installation Diagram

    System Installation Diagram RS-485 DEX16 EC16 DC12V Alarm FIRE Power In 17-32 layers of extended output Switch TCP/IP TCP/IP Elevator Keys Bus Elevator Cabs F17-32 D147 F1-16 Card Issuer DC12V FR1200 Elevator operation panel...
  • Page 6 #7 DEX16 Notes: 1. A maximum of seven DEX16 expansion boards can be connected to one EC16 controller. 2. The total can be expanded to 128 layers at most. 3. Before power is supplied, use the DIP switch to set the RS-485 addresses of the DEX16s, following the order in which each DEX16 is connected.
  • Page 7 Elevator Button Connection Elevator original logic controller Elevator button wiring Instruction: Lamp Cord 1 Connect Signal Cable 1 to the NO terminal Lamp Cord 2 of the corresponding floor. After Signal Cable Signal Cable 1 2 is disconnected, COM and NC terminals Signal Cable 2 are connected to the COM and NC terminals Elevator Button...
  • Page 8: Reader Connection

    The device automatically obtains and transmits the information carried by the card or QR code to the controller. 3. Each EC16 can connect a maximum of eight RS-485 readers and two Wiegand readers.
  • Page 9 Connect to ZKBio CVSecurity 1. Add the elevator control device on the software Login to the software and add the device by searching. The process is as follows: 1) Click Elevator > Elevator Device > Device to enter the device setting interface. 2) Click Search to open the Search interface in the software.
  • Page 10 3. Assign elevator control levels group 1) Click Elevator > Elevator Control Rule > Elevator Levels to enter the setting interface. 2) Click New to add a new elevator control level group. 3) Enter the level name, time zones and setting area, then click OK to confirm and exit. 4) After adding successfully, check the levels group.
  • Page 11 4. Setting of Elevator Control Authority Allocation Authority allocation is used to manage the elevator control authority of personnel. Only after the authority allocation can personnel normally verify the operation of entering and leaving the elevator. Permission assignment supports three methods: setting access by levels, setting access by person, and setting access by department.
  • Page 12 c. Set Access By Department 1) Click Elevator > Elevator Control Rule > Set Access By Department to enter the setting interface. 2) Check the department and click the Add to Default Levels icon in its bar to open the settings window.
  • Page 13 ZKTeco Industrial Park, No. 32, Industrial Road, Tangxia Town, Dongguan, China. Phone : +86 769 - 82109991 : +86 755 - 89602394 www.zkteco.com Copyright © 2023 ZKTECO CO., LTD. All Rights Reserved.