Programming Software - Xinje XG Series User Manual

Table of Contents

Advertisement

Terminal block dimension
Wiring method
When wiring, press the spring switch with a small screwdriver, insert the wire into the corresponding jack, and
release the spring switch. The terminal block requires that the length of wire stripped is 1.5cm.
Installation
Please install the terminal block on a 35mm wide guide rail.
(2) Connecting cable
When connecting the terminal block externally, connecting cables need to be used together. Xinje provides
JC-G26-NN05, JC-G26-NN10, JC-G26-NN15 cables with different lengths and specifications for users to
choose and buy. Please note that when connecting, one end which the transparent heat shrinkable tube wrapped
the model is connected to XG2, and the other end is connected to the terminal block, which cannot be
reversed!!!
The connection diagram is as follows
Module
Note: When connecting with the terminal block, please pay attention to the position of the card slot of the terminal
block, and do not connect it upside down

3-2-5. Programming software

In the programming software, the functions of writing or uploading programs to PLC, monitoring the operation
of PLC in real time, configuring PLC and so on can be realized. After the "Xinje PLC programming tool
software" is installed on the personal PC, the connection between PLC and programming software can be
realized through the USB port of the basic unit using the USB download cable.
24
transparent heat shrinkable tube
(Unit: mm)
terminal block

Advertisement

Table of Contents
loading

This manual is also suitable for:

Xg-e8ad-aXg-e8ad-vXg-e4ad2daXg-e4daXg-e8pt3-pXg-e8tc-p

Table of Contents