CONTENTS
2 x straight walls
1 x curved wall
1 x PVC sheet for base
ASSEMBLY
Two people should assemble this product together as the components are quite heavy.
1. Ensure that the ballpool is sited in a suitable position e.g. on a flat, stable floor that is capable
of holding its weight – approximately 110kg when empty.
2. Position the PVC sheet in the required position in the room ready to build walls around it.
Make sure the Velcro of the PVC sheet will match the Velcro of the walls.
3. Build the walls onto the PVC sheet. Insert the wooden tongue of one wall into the slot on the
other, ensuring that the wooden hooks fully engage.
4. The tongued wall will rise as it is inserted and then drop level with the slotted wall when they
fully engage. To avoid spraining this joint, keep the angle of the wall at 90˚.
5. Repeat procedure for the third wall.
6. Pour in your ballpool balls. Allow approximately 15cm gap at the top – otherwise, the balls at
the top will fall out as people get inside the ballpool.
CARE & MAINTENANCE
Wipe the fabric clean with a mild cleaning product e.g. Dirt Lift 14800.
Avoid sharp and pointed objects e.g. remove shoes with buckles before use.
SAFETY
Always supervise the use of this product.
For indoor use only, in dry environments.
KORNERKURVE BALLPOOL 18112, 18118
Copyright ROMPA® Ltd
KORNERKURVE BALLPOOL 18112, 18118, KH 4.07
Need help?
Do you have a question about the 18112 and is the answer not in the manual?
Questions and answers