Download Print this page

Percussion Play Surface Fixed Marimba Installation Instructions

Advertisement

Quick Links

Installation Instructions
1.1
Surface Fixed
Marimba
Page 1 of 2
1.2
Instrument
Components:
x4
M6x20 Security Screw
x2
M6 Saddle Strap
x4
M8x60 Security Screw
x4
1.3
M8 Barrel Nut
x4
M8 Square Nut
Weight of heaviest part
BS EN 1176
1.4
1.5
15kg
(Notes)
Surface Fix
Pair Large Red
Beaters X2
Components:
M8x60 Security Screw
1. Assemble frame and notes
as shown in images 1.2, 1.3
and 1.4(see Assembly Guide).
2. Attach Surface Fixing Plates
to base of each leg using
fixings provided (See Surface
Fix Post Installation Sheet).
3.Locate Instrument in
desired location and mark
holes to fix to desired surface.
4. Fix to Surface using
recommended ground
anchors not supplied.
5. Make sure all fixings are
covered and secure using
cover caps provided.
6. Beaters can be fixed to
frame with fixings provided
1.5.
Metric
Conversion:
250mm/ 10"
300mm/ 12"
400mm/ 16"
750mm/ 30"
1.5m/ 59"
Ground Anchors
x4
x8
not supplied
2 Part Cover Cap
Install Instrument
with 1.5m free space
(from widest point)
around it.
1.5m
1.5m
1.5m
1.5m
750mm
Ground Surface
Spares available from
percussionplay.com
or from your
local distributor
42 Kg

Advertisement

loading

Summary of Contents for Percussion Play Surface Fixed Marimba

  • Page 1 Installation Instructions Install Instrument with 1.5m free space (from widest point) around it. 1. Assemble frame and notes 1.5m 1.5m as shown in images 1.2, 1.3 and 1.4(see Assembly Guide). Surface Fixed 2. Attach Surface Fixing Plates Marimba to base of each leg using fixings provided (See Surface Page 1 of 2 Fix Post Installation Sheet).
  • Page 2 Assembly Guide PPMARI Tools: TX 40 Driver Bit TX 30 Driver Bit Thread Lock Solution Required (No Supplied) Surface Fixed Marimba Page 2 of 2 COMPONENTS LIST: M8x60 Pin torx X8 M8 Barrel Nut Pin torx X4 M8 Square nut X4 Saddle Strap X2 Instrument Components:...