Download Print this page

Percussion Play PPMARI Installation Instructions

Surface fixed marimba

Advertisement

Quick Links

Installation Instructions Flat Pack
1.1
Surface Fixed
Marimba
Page 1 of 2
1.2
Instrument
Components:
x4
M6x20 Security Screw
x2
M6 Saddle Strap
x4
M8x60 Security Screw
x4
1.3
M8 Barrel Nut
M8 Square
Nut X4
Weight of heaviest part
BS EN 1176
1.4
1.5
15kg
(Notes)
Surface Fix
Pair Large Red
Beaters X2
Components:
1. Assemble frame and notes
as shown in images 1.2, 1.3
and 1.4(see Assembly Guide)
2. Attach Surface Fixing Plates
to base of each leg using fixings
provided (See Surface Fix Post
Installation Sheet)
3.Locate Instrument in desired
location and mark holes to fix
to desired surface.
4. Fix to Surface using
recommended ground
anchors not supplied
5. Make sure all fixings are
covered and secure using
cover caps provided
6. Beaters can be fixed to
frame with fixings provided
1.5
x4
x8
2 Part Cover Cap
M8x60 Security Screw
1.5m
1.5m
KS1,2,
KS1 – 650mm
KS2 – 750mm
Spares available form
Ground Anchors
percussionplay.com
or from your
not supplied
local distributor
Install Instrument
with 1.5m free space
(from widest point)
around it.
1.5m
1.5m
Ground Surface
Metric Conversion:
250mm/ 10"
300mm/ 12"
400mm/ 16"
650mm/ 26"
750mm/ 30"
1.5m/ 59"
42 Kg

Advertisement

loading

Summary of Contents for Percussion Play PPMARI

  • Page 1 Installation Instructions Flat Pack Install Instrument 1. Assemble frame and notes with 1.5m free space (from widest point) as shown in images 1.2, 1.3 around it. and 1.4(see Assembly Guide) 1.5m 1.5m Surface Fixed 2. Attach Surface Fixing Plates to base of each leg using fixings Marimba provided (See Surface Fix Post Page 1 of 2...
  • Page 2 Assembly Guide PPMARI Tools: TX 40 Driver Bit TX 30 Driver Bit Thread Lock Solution Required Surface Fixed Marimba Page 2 of 2 COMPONENTS LIST: M8x60 Pin torx X8 M8 Barrel Nut Pin torx X4 M8 Square nut X4 Saddle Strap X2...