Percussion Play Sonora Installation Instructions

Ground fixed

Advertisement

Quick Links

Installation Instructions
Ground Fixed
Sonora
Page 1 of 3
Components:
x4
M10x100 Security Screw
x8
M10 Flanged Slide Bearing
x2
Eye Straps
x4
M6x20mm
Secure Screw
Thread Lock Solution
Required (Not Supplied)
BS EN 1176
Weight of heaviest part
30kg
Ground Fix
Pair Small
Beaters X2
Components:
1. Carefully lay 2 x legs on a
level surface and insert
M10x200 bar and nuts. Using
packing box as protection lay
instrument note side down on
the card. Line up pre drilled
holes in the backboard with
the legs and ensure the
instrument is aligned square
with the legs. Fix in place
using M10x100mm screws
supplied (see installation
guide)
2.(See ground fix
sheet)Excavate 2 holes on site
of installation approximately
500mm deep ( adjust depth
according to age range for
intended players)
3. Carefully raise the
instrument from the ground
with legs attached and locate
(lower) legs into holes making
sure they are vertical and level
prior to concreting in place.
4. Once happy with location
and levels, fill holes using
Metric Conversion:
rapid hardening concrete. Be
500mm/ 20"
750mm/ 30"
sure to compact concrete
900mm/ 35"
around legs and leave to dry
1100mm/ 43"
according to manufactures
1.5m/59"
guidelines
x4
x8
M10x200 Threaded Bar
M10 Nut
5. Beaters can be fixed to
Stainless Steel posts with
fixings provided
1.5m
KS1 – 750mm
KS2 – 900mm
Adult – 1100mm
Ground Surface
Spares available form
percussionplay.com
Install Instrument
with 1.5m free space
(from widest point)
around it.
1.5m
1100
500mm
42 Kg
or from your
local distributor

Advertisement

loading

Summary of Contents for Percussion Play Sonora

  • Page 1 Line up pre drilled Ground Fixed holes in the backboard with 1.5m 1.5m the legs and ensure the Sonora instrument is aligned square Page 1 of 3 with the legs. Fix in place using M10x100mm screws supplied (see installation guide) 2.(See ground fix...
  • Page 2 Assembly Guide PPSWAV Tools: TX 45 Driver Bit TX 30 Driver Bit Ground Fixed Sonora Page 2 of 3 Components: COMPONENTS LIST: M10x100 Security Screw Saddle Strap X2 M6x20 Pin torx X4 M10 Flanged Slide Bearing M10x100 Pin torx X4...
  • Page 3 Ground Fix Installation Foundations should not present a hazard. These foundations are recommended as a guide, for more information on foundation details for various surface see Part 7 of BS EN 1176. Ground Fixed Sonora Page 3 of 3 (1.1) Components: M10x200mm...