Installation Instructions
Surface Fixed
Cherub
Page 1 of 3
Components:
x4
M10x100 Security Screw
x2
Eye Straps
M6x20mm
Secure Screw
Thread Lock Solution
Required (Not Supplied)
BS EN 1176
Weight of heaviest part
15kg
Surface Fix
Pair Small
Beaters X1
Components:
M10x70 Security Screw
1. Carefully lay 2 x legs on a
level surface and insert
M10x200 bar and nuts. Using
packing box as protection lay
instrument note side down on
the card. Line up pre drilled
holes in the backboard with
the legs and ensure the
instrument is aligned square
with the legs. Fix in place
using M10x100mm screws
supplied (see installation
guide)
2. Attach surface plates to
each leg with M10x70mm and
Barrel nuts supplied. ( See
Surface Fix Installation Sheet)
3.Locate Plates in desired
location and mark holes to fix
to desired surface.
5. Make sure all fixings are
covered and secure using
cover caps provided
5. Beaters can be fixed to
Stainless Steel posts with
fixings provided
x2
x2
M10 Barrel Nut
2 Part Cover Cap
1.5m
Ground Surface
Spares available form
Ground Anchors
x8
percussionplay.com
not supplied
local distributor
Install Instrument
with 1.5m free space
(from widest point)
around it.
1.5m
Metric Conversion:
500mm/ 20"
750mm/ 30"
900mm/ 35"
1100mm/ 43"
1.5m/ 59"
1100
KS1 – 750mm
KS2 – 900mm
Adult – 1100mm
22 Kg
or from your