Polygroup Funsicle Oasis Pool User Manual page 17

Hide thumbs Also See for Funsicle Oasis Pool:
Table of Contents

Advertisement

10. Look through the hole at the bottom of the T-Fitting, as you insert the Vertical Leg with Leg Cap,
rotate it until the buttons align with the holes and pop out, locking the Vertical Leg in place (see
following figure). Do this for all Vertical Legs.
NOTE: Each Vertical leg has a V-Shaped Spring Pin pre-installed. There is an extra pin included with
your pool parts.
TIP: To avoid distortion during the assembly of the pool frame, connect one Vertical Leg to Every
third T-Fitting so the frame can stand comfortably.
11. Continue working around the perimeter until the entire liner is securely connected to the frame. Go
around and check all T-Fittings, Push-buttons of O-Pins, Legs and Beams are properly installed and
secured in place (see following figure).
12. Make sure the poles are perpendicular to the ground (and not leaning!). This may require you to
adjust the vertical legs accordingly to make the walls straighter.
17

Advertisement

Table of Contents
loading

Table of Contents