Trane CONQUEST CGAX Series Installation Operation & Maintenance page 9

Air-cooled scroll chillers and heat pumps 43-164 kw r410a/r454b
Table of Contents

Advertisement

Installation requirements and contractor responsibilities
A list of the contractor responsibilities typically associated with the unit installation process is provided.
Sound power levels
Type of requirement
Foundation
Discharge
Measurement conditions:
Rigging
Measurements taken in a room adjacent to the room containing the FWD, at the outlet of the rectangular duct (1.5 m
long) fixed to its discharge opening.
Isolation
Fan
Unit
speed
1
FWD 08
2
3
1
Electrical
FWD 10
2
3
1
FWD 12
2
3
1
FWD 14
2
3
1
FWD 20
2
3
Water piping
Intake
Measurement conditions:
Measurements taken at the horizontal air intake.
Insulation
Fan
Unit
speed
Water piping connection elements
1
FWD 08
2
3
1
FWD 10
2
3
Refrigerant leak detector R454B
1
FWD 12
2
Refrigerant leak detector R454B is an option available only for R454B units. It is installed in the factory and set
3
according to the critical thresholds but it is not wired.
1
FWD 14
2
There are two relays available: Relay 1 for warning message and Relay 3 for critical message. When warning or
3
critical levels of R454B concentrations are reached, customer has to shutdown the electrical power to the unit.
1
FWD 20
2
It is needed to use a disconnect switch upstream from the unit, operated remotely, that will open electric circuit to
3
the unit when there is a refrigerant leakage. Please consult wiring diagrams regarding to the relay's connection. The
refrigerant detector is identified as 3A6.
CG-SVX027E-GB
UNT-PRC002-GB
Trane factory Supplied
Trane factory Supplied
Trane factory Installed
Neoprene pads (Optional)
Power level in dB(A), per Hz frequency band
125
250
55
50
57
54
58
57
• Disconnect Switch
57
51
58
54
• Unit mounted starter
60
58
57
51
58
54
60
58
56
62
61
66
63
69
57
63
61
66
63
69
• Insulation
Power level in dB(A), per Hz frequency band
• Grooved pipes coupling
125
250
• Grooved pipe
56
55
63
62
66
65
62
58
66
63
70
67
62
58
66
63
70
67
66
65
73
72
78
76
68
72
76
76
78
79
Field Installed
Meet foundation requirements
• Safety chains
• Clevis connectors
• Lifting beams
Isolators
(customer supplied)
• Wiring sizes per submittals and local codes
500
1000
2000
42
37
37
• Terminal lugs
47
40
30
50
42
32
• Control voltage wiring
45
42
34
• Ground connection(s)
48
45
38
• BAS Wiring (optional)
50
48
40
45
42
34
• Chilled water pump contactor and wiring
48
45
38
50
48
40
• Option relays and wiring
50
48
39
55
53
47
• Taps for thermometers and gauges
58
56
50
• Thermometers
51
49
40
•  W aterflowpressuregauges
55
53
47
58
56
50
• Isolation and balancing valves in water
• Vents and rains
• Pressure relief valves
• Pressure switch device to detect lack of
• Insulation (piping)
500
1000
2000
and stub pipe (Optional)
55
53
46
60
60
53
63
62
56
55
58
51
60
62
56
63
65
59
55
58
51
60
62
56
63
65
59
65
65
57
69
71
64
73
75
69
64
64
56
68
71
65
71
74
69
Pre-Installation
Field supplied
Field installed
4000
8000
and regulations
31
30
38
40
40
43
33
28
39
35
42
39
33
28
39
35
including interlock
42
39
38
36
46
45
50
49
39
37
46
45
50
49
piping
water
4000
8000
45
42
53
53
55
57
48
44
55
52
59
57
48
44
55
52
59
57
50
46
59
57
64
63
52
50
61
61
66
66
Overall power
dB(A)
46
50
53
48
51
54
48
51
54
56
60
63
57
60
63
Overall power
dB(A)
57
64
67
61
66
69
61
66
69
68
74
78
69
75
78
9 1 1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents