1.2 Field of application m³/h. B: Trolly with mounted spring balance. GEOVENT Pneumatic rail system is developed for the C: Connection for rail system. Rails come in lengths of 2 extraction of exhaust. When installed meter and can be combined to suit your needs.
2.0 Installation The Pneumatic rail system is delivered in separate parts. Recommended height of installation is 3 to 5 meters. Use one suspension bracket approximately every 2 me- ters of alu profile: One in each end and one at each joint. Installation should be carried out by a trained profes- sional.
Page 5
Safety coupling The safety coupling is placed in the lower part of the hose – between the pneumatic switch and the nozzle. The safety coupling disconnects if the nozzle does not disconnect from the exhaust pipe when the fire truck le- aves the station.
2.2 Test run • Locate the nozzle of the flexible hose on the exhaust pipe. Fasten the nozzle by activating the pneumatic switch on the hose. After installation, make sure that the trolly can move freely along the entire rail. Test that the nozzle stays •...
Wear on parts such as filter cartridges and hose is not included in the warranty. User liability In order for Geovent to be capable of granting the de- clared warranty, the user/fitter must follow this Instructi- on manual in all respects.
DK-8831 LØGSTRUP Lise Cramer Hereby declares that: The product: Rail system Date: 28-09-2020 Models: PRS – Pneumatic rail system Position: Director Name: Thomas Molsen has been manufactured in compliance with the following directives and standards: European Parliament and Council Directive 2006/42/...
Need help?
Do you have a question about the PRS and is the answer not in the manual?