Page 1
I N S T R U C T I O N M A N U A L C O M P A C T A R M ø160 and 200 mm www.geovent.com Version 2.0 13.09.2022...
Page 3
1000 Demounting the spring is deadly dangerous. 1.2 Field of application The COMPACT arm is the ideal Extraction arm for the extraction of welding smoke, grinding dust, fumes, etc. when there is only limited space available in the 1000 1200 1400 1600 1800 2000 2200 working area.
Page 4
2.0 Installation The COMPACT arm is supplied partly assembled. Depending on model, it may consist of one carrying arm, one hood, and one set of hose with clamp and rubber band.
Page 5
V-ring 170 Part for COMPACT arm ø114 friction disc Balance for COMPACT arm ALU inner arm 2.1 Mounting of optional equipment M8 bolt Mounting of the extension arm 1 meter extension arm: ø80 bell disc Start by fi xing the extension arm to a solid wall, e.g. a concrete wall.
Page 6
After the final mounting, the COMPACT arm should be • something has been hung on the extension arm. It is...
Page 7
The arm slides out in the telescopic fittings. User liability The balancer at the back of the ceiling bracket needs to In order for Geovent to be capable of granting the de- be adjusted, see chapter 2.7. clared warranty, the user/fitter must follow this in struction manual in all respects.
Need help?
Do you have a question about the COMPACT arm and is the answer not in the manual?
Questions and answers